TVSC Didcot 28/11/2016 at 14:08 #89544
casey jones
Avatar
72 posts
Just been to the TVSC Didcot for my yearly visit all changed a lot now 11 workstation and a crossing keeper very busy in deed

cheers

mick

Log in to reply
TVSC Didcot 29/11/2016 at 00:05 #89575
JamesN
Avatar
1575 posts
Online
Scalable v2 just been installed this weekend on the London desks.
Log in to reply
The following user said thank you: francisoldfield
TVSC Didcot 30/11/2016 at 15:35 #89601
eriks
Avatar
5 posts
JamesN in post 89575 said:
Scalable v2 just been installed this weekend on the London desks.
James, do you know what Scalable v2 does over the previous version? Do you know how much downtime a workstation needs to perform the upgrade?

Log in to reply
TVSC Didcot 30/11/2016 at 18:12 #89605
JamesN
Avatar
1575 posts
Online
Changes the interface slightly, both in terms of how it looks and how the signalman interacts with it (mouse and standard keyboard vs trackball and special keyboard).

As for downtime requirements; not aware of the specifics, but the engineers possession to do the work was 12hrs "wheels free" on Sunday morning.

Log in to reply
TVSC Didcot 30/11/2016 at 19:11 #89606
eriks
Avatar
5 posts
Thanks for the info James. Was that work responsible for the overrun on Sunday which caused the trains to be chaotic after lunchtime?

How many workstations will be in TVSC when the migrations are complete?

Log in to reply
TVSC Didcot 30/11/2016 at 19:25 #89607
JamesN
Avatar
1575 posts
Online
There were unrelated issues with the possession which prevented a timely handback. The migration was successful.

The ultimate extent of TVSC is still a bit unknown; there are at least 2, more likely 3 workstations still to go in.

Log in to reply
TVSC Didcot 30/11/2016 at 20:03 #89608
KymriskaDraken
Avatar
963 posts
JamesN in post 89607 said:

The ultimate extent of TVSC is still a bit unknown; there are at least 2, more likely 3 workstations still to go in.
It's stretching the definition of "Thames Valley" to include bits of Bristol Panel :)


Kev

Log in to reply
TVSC Didcot 30/11/2016 at 20:47 #89609
eriks
Avatar
5 posts
Presumably there is a physical limit. Certainly from the outside it doesn't look very big - when compared to Rugby or 3 Bridges. I presume that TOC staff and control won't move into TVSC. Are they in Slough now?
Log in to reply
TVSC Didcot 30/11/2016 at 22:39 #89612
JamesN
Avatar
1575 posts
Online
TOC control is where I work. We're "integrated" with Network Rail in Western Region control in Swindon.

There are some whispers that we might be moving to Didcot, it's all tied in with how many workstations end up in there.

Log in to reply
TVSC Didcot 02/12/2016 at 17:41 #89656
MrBitsy
Avatar
121 posts
I transferred there from West Hampstead a month ago - loving it!
TVSC Link 4 signaller - Temple Meads, Bath & Stoke Gifford
Log in to reply
TVSC Didcot 08/12/2016 at 20:53 #89789
Tange
Avatar
9 posts
Hi There,

I am one of the screen designer who worked on the Upgraded workstation screens for the Paddington - Slough upgrade. for Resonate (formally DeltaRail,AEA technology etc).

The new workstations, as above, use a mouse and keyboard for input. Some features I like are using a 'drag and drop' box to apply engineering possessions / Traction isolations, having standard computer functions like search (for any signalling object or headcode) drop down right click boxes for doing all sorts of signalling things, being able to pan and zoom the display.

Also, the workstations are linked together by a middleware, allowing signallers to see the other workstations areas of lookback on their own workstation. On a classic IECC, this would just be headcodes (TD maps) but on scalable V2 the middleware can supply non-controllable, full signalling information. The idea is that at some point all of the ROC signallers will be able to have large areas of the route on their workstation, so they can see whats going on at critical regulation points. Currently this is limited to a few 10's of signal sections.

Hope that helps but i am happy to answer questions. I do want to get down to TVSC to see it in action myself :-)

James Mc

Log in to reply
The following users said thank you: eriks, headshot119, JamesN, BarryM
TVSC Didcot 11/12/2016 at 13:44 #89835
DaveHarries
Avatar
1267 posts
While at the Bristol end of Platform 4 while awaiting 1C20 from Swindon on 24th November I saw that there is a display screen which shows the signal aspects. Displays in sync with TVSC as well as I saw one or two of the signals change as I was looking at it. Better than the display in the subway at Bristol Temple Meads though.

Picture attached.

Dave

Post has attachments. Log in to view them.
Last edited: 11/12/2016 at 13:47 by DaveHarries
Reason: Smaller picture file.

Log in to reply
The following user said thank you: BarryM
TVSC Didcot 12/12/2016 at 13:03 #90847
eriks
Avatar
5 posts
MrBitsy in post 89656 said:
I transferred there from West Hampstead a month ago - loving it!
Are you on the 'London End'? How does the 'ROC' enviroment compare to West Hampstead?

Log in to reply
TVSC Didcot 14/12/2016 at 16:17 #90876
MrBitsy
Avatar
121 posts
I'm on Link 2, the Reading side.

Certainly very different with the work managing ARS instead of regulating every train. Took a week or so to stop feeling 'disconnected' from the trains by going from NX to a mouse & keyboard. However, loving the change and new challenges.

TVSC Link 4 signaller - Temple Meads, Bath & Stoke Gifford
Log in to reply
TVSC Didcot 11/02/2017 at 01:25 #93035
eriks
Avatar
5 posts
What workstations are on link2?
Log in to reply
TVSC Didcot 11/02/2017 at 08:48 #93037
JamesN
Avatar
1575 posts
Online
eriks in post 93035 said:
What workstations are on link2?

Twyford, Reading (Station), Reading West Junction, Newbury

Log in to reply
TVSC Didcot 12/02/2017 at 11:44 #93065
GW43125
Avatar
495 posts
JamesN in post 93037 said:
eriks in post 93035 said:
What workstations are on link2?

Twyford, Reading (Station), Reading West Junction, Newbury
Does anyone happen to know what the rough workstation boundaries are in TVSC?

Log in to reply
TVSC Didcot 12/02/2017 at 13:06 #93068
Danny252
Avatar
1461 posts
About 15 seconds of searching on Google will being you up hundreds of photos of TVSC, organised by WS: http://photos.signalling.org/index?/category/205-thames_valley_sc
Log in to reply
TVSC Didcot 12/02/2017 at 13:34 #93071
GW43125
Avatar
495 posts
Danny252 in post 93068 said:
About 15 seconds of searching on Google will being you up hundreds of photos of TVSC, organised by WS: http://photos.signalling.org/index?/category/205-thames_valley_sc
Thank you for pointing me to this excellent website!

Log in to reply