25 - 05 - 2013

Ads by Google

Shout box

Turn off/on Sound Smileys History FAQ Kide Chat
simon.vale : Thank you Pan :)
panpantom: well done Simon (SV17) first time on KX mp
signaller1: full with a q!
panpantom: KC: Palace seeks a signaller
simon.vale : I'm SV17
simon.vale : Yeh - but I'm a newbie - I'll need something easy to do
panpantom: Simon are you up for KX?
simon.vale : I'm joining
panpantom: any more joining KX?
arabianights: *hurray
arabianights: huray
panpantom: KX hosting details on forum
panpantom: I'll host a KX
simon.vale : I'm going to guess he isn't going to turn up
simon.vale : maybe not..
simon.vale : Haha - its not 10pm yet - patience ;)
arabianights: that said it this does kinda require the 10pm host guy to turn up...
arabianights: :)
simon.vale : And there weren't any spare platforms in Liverpool Street either
simon.vale : I made a huge mistake with the Liverpool Street Sim - I had the Bishopsgate Tunnel closed, and there was just a huge queue of 5 trains trying to get to Bethnal Green
simon.vale : Yeh that would be good - I'm not sure I trust myself with anything more
arabianights: cause it's not really possible to make a HUGE mistake with that
arabianights: or if you're completely new it might be worth asking to do the hertford loop
simon.vale : ok
arabianights: what normally happens is everyone is assigned a panel on a first come first served basis
arabianights: you will have to speak to the host about it but they will probably not want to link with a complete newbie cause there are lots of extra issues if you are a host (which you would have to be if you wanted to link)
simon.vale : as you can link sims together can't you?
simon.vale : I also have the Royston one - so I could just be left to that one as its simple enough ;)
simon.vale : Just installed it
simon.vale : Ok :)
arabianights: download simsig kings cross (and simsig main files) then wait for thread in the forum with details for the multiplayer
simon.vale : I'm a relative newb but I don't mind trying out a signalling session. What do I need to do?
Morsey: More KX?! Im up for it :P
arabianights: moi aussi
georgerb: KX @ 10pm - count me in please
jc92: sounds like a good plan :) I could look at hosting a late night Sim circa 10pm

Only registered users can send messages, register or login
Forum
Private Messages

You are not logged in.

Forum Latest
Upcoming Events
There are no events in the selected category
Login Form

Welcome, Guest
Username: Password: Remember me
  • Page:
  • 1
  • 2

TOPIC: I need a little signal help

I need a little signal help 15 Apr 2010 09:27 #11

  • AndyG
  • AndyG's Avatar
  • NOW ONLINE
  • Moderator
  • Posts: 969
  • Thank you received: 146
Getting a bit off topic for a Newcomer's thread really, as the originator's question has been answered.
The administrator has disabled public write access.

I need a little signal help 15 Apr 2010 09:28 #12

  • Forest Pines
  • Forest Pines's Avatar
  • OFFLINE
  • Signaller
  • Posts: 218
  • Thank you received: 9
kbarber wrote:
(In fact it's not that unusual to see several generations of equipment, all built to different standards/principles and with different meanings to match, at one location.)

In fact, the shunt signal replacement programme has made it very common indeed!

(it's been a few years now since I've seen a shunt signal showing red/white for on, but I haven't been a great explorer of the network over that period).
The administrator has disabled public write access.

I need a little signal help 15 Apr 2010 10:28 #13

  • clive
  • clive's Avatar
  • OFFLINE
  • Administrator
  • Posts: 690
  • Thank you received: 184
If I remember correctly, the requirement is that you mustn't have shunt signals of the two different types (R/W and R/R) visible to a driver. Thus you have to change all Down signals at a site simultaneously, and all Up signals simultaneously, but you can have Up and Down being different types and you can have different types at opposite ends of a station or otherwise well-spaced apart.

Ah: "Where independent position light signals that display [two reds when ON] are to be added to an existing signalling layout that includes independent position light signals that display a different form of ON aspect, the signalling layout shall be designed so that:
a) Drivers will not observe the different forms of ON aspect at the same time during train movements, and
b) The transition between the different forms of ON aspect is clearly defined."
The administrator has disabled public write access.
  • Page:
  • 1
  • 2
Time to create page: 0.170 seconds