ERTMS Operation

You are here: Home > Forum > Miscellaneous > The real thing (signalling) > ERTMS Operation

Page 2 of 2

ERTMS Operation 27/01/2019 at 11:36 #115098
Ravensblood
Avatar
1 posts
The Balise is there to pinpoint where the train is as well as transitioning the train into ERTMS. ERTMS is the inclusion of GSM-R and all other systems. ETCS is just the signalling system. The Track circuit or Axle counter is there for the signaller to have a visual on the train on his screens.