Hope valley line

You are here: Home > Forum > Simulations > Released > Sheffield (Obsolete .exe) > Hope valley line

Page 1 of 1

Hope valley line 13/12/2011 at 18:19 #25175
5097sarum
Avatar
3 posts
I am writing a timetable for Sheffield 1980 version . I unable to list timings farther than Hope going from Dore and Totley to Chinley and this problem seems to be the same coming the other way .Does any one know if their is a bug or am I missing trick ?
Any advice would be gratefully recieved .

Log in to reply
Re: Hope valley line 13/12/2011 at 18:21 #25176
jc92
Avatar
3629 posts
should be locations for earles sidings, edale and chinley which are all compulsory timing points
"We don't stop camborne wednesdays"
Log in to reply
The following user said thank you: 5097sarum
Re: Hope valley line 14/12/2011 at 10:15 #25443
58050
Avatar
2650 posts
5057sarum there are 2 options you could do. The first is I think you need WTT Section CM or its equivalent for the period you are writing your timetable. The easier way I would have thought is if you download the Sheffield 1983/84 timetable which I wrote & make a note of the timings between each timing point required for the timetable as the Hope Valley services were DMUs then as in your 1980 timetable for both Up & Down trains.
Log in to reply