Westbury routes 18/03/2016 at 10:08 #81247
Jamesh1492
Avatar
23 posts
Hello I'm playing Westbury this morning and I'm realising once the train has gone past the route I've set its not cancelling and ive got reset all the routes my self? can any shead some light on this please?

James

Log in to reply
Westbury routes 18/03/2016 at 10:14 #81248
Stephen Fulcher
Avatar
2007 posts
Train operated route release only works in certain difficulty levels. I cannot remember exactly which, but if you have it on the harder levels you will have to cancel the routes out behind each train.

This is prototypical for this type of panel and interlocking.

Log in to reply
The following user said thank you: Jamesh1492
Westbury routes 18/03/2016 at 10:17 #81249
headshot119
Avatar
4869 posts
Yes the real Westbury panel is a Western Region E10K Push Push panel. Due to the nature of this type of panel, they aren't fitted with TORR (Train Operated Route Release). This is accurately represented in the Westbury simulation unless you are playing on Perfect or Beginner mode.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Last edited: 18/03/2016 at 10:21 by headshot119
Log in to reply
The following user said thank you: Jamesh1492
Westbury routes 18/03/2016 at 10:21 #81251
Jamesh1492
Avatar
23 posts
cheers for the quick replies guys
Log in to reply
Westbury routes 18/03/2016 at 10:22 #81252
JamesN
Avatar
1570 posts
What you're observing is a lack of TORR (Train-Operated Route Release)

To make the route "vanish" behind a train in panels - such as Westbury - needed a lot of extra circuitry/relays in the late 50s design of Interlocking Westbury uses. Given Westbury's traffic levels it was decided pulling the button up after every train was a much simpler solution!

As technology progressed into the 1980s and these circuits became cheaper/easier to do it became more prevalent, and in SSI (IECCs etc) it's just a few more line of code - no real hardship at all.

The majority of sims which cover a No-TORR panel will either provide an option on startup, or simulate the panel as if it had TORR. Westbury's author has decided instead to link TORR state to the difficulty selected on startup, rather than provide a specific option. If I recall correctly "Beginner" has TORR, the other difficulties have no TORR.

EDIT: Stephen and Karl beat me to it....

Last edited: 18/03/2016 at 10:23 by JamesN
Log in to reply
The following user said thank you: Jamesh1492
Westbury routes 18/03/2016 at 10:27 #81254
headshot119
Avatar
4869 posts
" said:
What you're observing is a lack of TORR (Train-Operated Route Release)

To make the route "vanish" behind a train in panels - such as Westbury - needed a lot of extra circuitry/relays in the late 50s design of Interlocking Westbury uses. Given Westbury's traffic levels it was decided pulling the button up after every train was a much simpler solution!

As technology progressed into the 1980s and these circuits became cheaper/easier to do it became more prevalent, and in SSI (IECCs etc) it's just a few more line of code - no real hardship at all.

The majority of sims which cover a No-TORR panel will either provide an option on startup, or simulate the panel as if it had TORR. Westbury's author has decided instead to link TORR state to the difficulty selected on startup, rather than provide a specific option. If I recall correctly "Beginner" has TORR, the other difficulties have no TORR.

EDIT: Stephen and Karl beat me to it....
Western region men are like buses, never any about, then three turn up at once.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
The following users said thank you: Jamesh1492, JamesN, Sacro, tjfrancis, flabberdacks
Westbury routes 18/03/2016 at 10:30 #81255
Stephen Fulcher
Avatar
2007 posts
The only application of TORR to E10k interlockings I know of were when some of the Reading Interlockings were moved into the Thames Valley Signalling Centre and driven off IECCs, but that was achieved through the IECC processors rather than with relays.

A turn-push panel could not possibly drive TORR, and the expense of providing it to the push-push panels at Westbury would be extortionate for negligible gain, and I am not sure that anyone officially even designed any circuits to allow for that.

Log in to reply
The following user said thank you: Jamesh1492
Westbury routes 18/03/2016 at 18:01 #81260
GeoffM
Avatar
6274 posts
" said:
A turn-push panel could not possibly drive TORR
It is perfectly possible, though a bit pointless when you have to turn the switch back on a turn-push anyway. However, it would be done at interlocking level, not panel level.

SimSig Boss