Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Suggested enhancements to 2000 era simulation for pre-2000 timetables

You are here: Home > Forum > Simulations > Released > Oxford PSB > Suggested enhancements to 2000 era simulation for pre-2000 timetables

Page 1 of 1

Suggested enhancements to 2000 era simulation for pre-2000 timetables 23/11/2017 at 19:58 #103252
whatlep
Avatar
376 posts
At Geoff Mayo's request, the following are suggested enhancements to the simulation in 2000 era which would facilitate timetables for earlier dates:

1) all movements between DCS2-4 and North Jn possible in both directions (enables multiple run-rounds and ECS departures northbound)
2) ability to hold two or more trains in any of DCS2-4 (eliminate "held by conditions" message)
3) ability to route trains to Loco Sidings via the Headshunt (movements from work OK, but moves to Loco Sdgs have to be done using the emergency connection from platform 2)
4) parcels dock roads able to be used separately and by multiple trains (same issue as (2))
5) ability to run-round locos using UCS (pass stop boards in UCS/ up through siding and use GF)
6 Up (& Down) Passenger Loop south of station to be Up (& Down) Goods Loop - only applies before March 1986
7) remove flashing yellows if commissioning dates can be established
8) add South Yard connections and signals as per 1973 "yellow perils"
9) ability to run-round MGR trains (between S Wales and Didcot) in Kennington Jn DGL
10) Passing loop at Bicester LNW and offers/ acceptance from there rather than Claydon LNE (existed at least until 1981 - date of removal not known)

Log in to reply
The following user said thank you: GeoffM
Suggested enhancements to 2000 era simulation for pre-2000 timetables 23/11/2017 at 20:05 #103253
headshot119
Avatar
4869 posts
Have added this as a feature request on the bug tracker as 18518, and linked it back to this thread.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Suggested enhancements to 2000 era simulation for pre-2000 timetables 23/11/2017 at 20:13 #103255
58050
Avatar
2650 posts
There's a couple of items you've missed which are some what much larger than the ones you've listed. These are the missing South Yard which is much larger than what is shown on the panel in the 2000 era. Plus Bletchington Cement Works is missing entirely & there were still trains runng from Toton to that location as well as on of the Bescot Speedlink trip workings that ran to Oxford/Didcot also called in there on an as required basis. IIRC I've listed these 2 already on MANTIS.
Log in to reply
The following user said thank you: whatlep
Suggested enhancements to 2000 era simulation for pre-2000 timetables 23/11/2017 at 21:32 #103258
JamesN
Avatar
1574 posts
For 10 - I suspect although can't confirm it would coincide with the commissioning of Claydon L&NE Junction SB; which was September 1985.
Last edited: 23/11/2017 at 21:32 by JamesN
Reason: None given

Log in to reply
Suggested enhancements to 2000 era simulation for pre-2000 timetables 24/11/2017 at 09:32 #103269
wellgroomed
Avatar
109 posts
Bicester No. 1 S.B. closed on 09/06/86.

Bicester C.O.D. siding commissioning was implemented in Feb 87.

Log in to reply
Suggested enhancements to 2000 era simulation for pre-2000 timetables 24/11/2017 at 19:27 #103295
GeoffM
Avatar
6280 posts
Ok, that's more than I was expecting. I thought it was minor tweaks required for a few trains!
SimSig Boss
Log in to reply