Motherwell 4.3 12/01/2018 at 18:04 #105007
headshot119
Avatar
2635 posts
Motherwell 4.3 and updated 2006 timetables are now available via check for updates.
"Platform 1 your Maesteg service. Platform 1A your Aberdare. Platform 2 your London!"
Log in to reply
The following users said thank you: MarkC, Hap, BarryM, Phil-jmw
Motherwell 4.3 12/01/2018 at 18:53 #105011
Hap
Avatar
134 posts
is that a 2015 TT that came with it?
HAP
Log in to reply
Motherwell 4.3 12/01/2018 at 18:59 #105012
Meld
Avatar
389 posts
Craig I have got a set for Scotland but they do need polishing
Log in to reply
The following user said thank you: Hap
Motherwell 4.3 12/01/2018 at 19:33 #105013
Hap
Avatar
134 posts
No worries mate. I am no further forward atm getting anything else. Still at it though.
HAP
Log in to reply
Motherwell 4.3 13/01/2018 at 12:23 #105024
HST125Scorton
Avatar
267 posts
Which areas has been electrified in the 2015 era? Manual for v4.3 just gives it as 'extended electrification'
Aaron (AJRO)
Log in to reply
Motherwell 4.3 13/01/2018 at 12:36 #105025
Steamer
Avatar
2685 posts
HST125Scorton in post 105024 said:
Which areas has been electrified in the 2015 era? Manual for v4.3 just gives it as 'extended electrification'
Everything shown on the map on this page, plus the Carmyle lines, and the lines to Garnqueen North Jn and Gartcosh Jn.

Let the challenge... Begin!
Last edited: 13/01/2018 at 12:36 by Steamer
Reason: None given

Log in to reply
Motherwell 4.3 13/01/2018 at 12:48 #105026
Peter Bennet
Avatar
4345 posts
HST125Scorton in post 105024 said:
Which areas has been electrified in the 2015 era? Manual for v4.3 just gives it as 'extended electrification'
There's a bit in the blurb on this page, perhaps the person who kindly did the map could do a second colour, a second map might be a bit much to cope with.

Peter

Stereotypes only have themselves to blame
Last edited: 13/01/2018 at 12:49 by Peter Bennet
Reason: None given

Log in to reply
Motherwell 4.3 13/01/2018 at 13:24 #105027
Steamer
Avatar
2685 posts
Peter Bennet in post 105026 said:
HST125Scorton in post 105024 said:
Which areas has been electrified in the 2015 era? Manual for v4.3 just gives it as 'extended electrification'
There's a bit in the blurb on this page, perhaps the person who kindly did the map could do a second colour, a second map might be a bit much to cope with.

Peter
Peter, the blurb says:

" said:
The following are NOT Electrified:
- Gartcosh Single line, though you can reverse electrics behind MG930 [GS3]
- Up/Down Shotts from Holytown Jn (Electrified in 2015)
Is this right? The Shotts line hasn't been electrified yet (March 2019 is the plan- but that's an NR estimate, so add at least a year), and hasn't the Gartcosh Single been wired throughout as part of the Springburn- Cumbernauld wiring?

Let the challenge... Begin!
Last edited: 13/01/2018 at 13:26 by Steamer
Reason: None given

Log in to reply
Motherwell 4.3 13/01/2018 at 14:06 #105028
Peter Bennet
Avatar
4345 posts
Sorry, missed out the Gartcosh single line.
I've pre-empted the Shotts electrification.

Peter

Stereotypes only have themselves to blame
Log in to reply
The following users said thank you: Steamer, Hap
Motherwell 4.3 13/01/2018 at 19:21 #105042
Hap
Avatar
134 posts
Peter there are a couple of new 3 state banner repeaters on panel 1.

1 for M148 UP mainline just after Newton West Junction (normal on/off BR)
1 for M186 After Uddingston Junction on the UP Holytown
1 for M194 After Uddingston Junction Up Main
1 for M193 approach to Uddingston Junction Down main, but located on the Up main because of curve.

there are more new 3 states in the area, but unsure of exact locations as I don't work over some of the routes.

Also, Panel 1 is now under control of Newton workstation at the WSSC. Signal prefixes are GMN. numbers remain the same.

Cheers,
Craig

HAP
Log in to reply
Motherwell 4.3 13/01/2018 at 19:36 #105043
Jan
Avatar
549 posts
Peter Bennet in post 105026 said:
HST125Scorton in post 105024 said:
Which areas has been electrified in the 2015 era? Manual for v4.3 just gives it as 'extended electrification'
There's a bit in the blurb on this page, perhaps the person who kindly did the map could do a second colour, a second map might be a bit much to cope with.

Can do.

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
The following users said thank you: HST125Scorton, Peter Bennet
Motherwell 4.3 14/01/2018 at 11:47 #105059
Peter Bennet
Avatar
4345 posts
I've temporarily withdrawn Bill's 1984 timetable from download area while I check it'll work on 4.3, don't think 4.2.3 had the Shotts line extension.