Another ARS issue...

You are here: Home > Forum > Simulations > Released > Swindon A and B > Another ARS issue...

Page 1 of 1

Another ARS issue... 12/08/2020 at 08:42 #130575
manadude2
Avatar
207 posts
Loaded up the Summer Saturday 2014 TT (0445 Start), and ARS wrongly routed 4V34 at Didcot East Jn:



Bit of an interesting one, as the timetable clearly says ML and Platform 1. ARS seems to have set the route from signal 911 correctly, but not from 905.

(The train is showing as non-ARS now as I cancelled the incorrect route)

Last edited: 12/08/2020 at 08:43 by manadude2
Reason: None given

Log in to reply
Another ARS issue... 12/08/2020 at 13:06 #130578
bill_gensheet
Avatar
962 posts
Seeded train generating bad route data

Needs a Moreton Cutting timing point with Path=ML Line=ML

Log in to reply
Another ARS issue... 22/08/2020 at 17:06 #130953
Steamer
Avatar
3741 posts
Looks like this was reported shortly after the timetable was released, but I never uploaded the fix...

Corrected version of the timetable available here: https://www.SimSig.co.uk/File/Details/2459

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply