Warrington PSB FAQ

You are here: Home > Forum > Simulations > Released > Warrington PSB > Warrington PSB FAQ

Page 4 of 4

Warrington PSB FAQ 31/01/2021 at 18:36 #136921
headshot119
Avatar
4869 posts
jc92 in post 136920 said:
headshot119 in post 136916 said:
whatlep in post 136915 said:
Is a position defined north of Wigan NW that would allow a loco to move from one platform to another using signal WN12 in a timetabled move? Thinking of loco changes diesel/electric as occurred for some years and also run-round manoeuvres. Apologies if I am missing the blindingly obvious.
Not that I can see, I've raised Mantis 32936 as a feature request.
I havent added it to mantis yet, but there's also no valid paths at WBQ to use the north reverse GPLs to facilitate loco changes in 3 and 4.
Mantis 32620 was raised and is marked as resolved. Might be worth checking the version available to testers and (de)escalating as appropriate.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Warrington PSB FAQ 17/02/2021 at 01:16 #137306
whatlep
Avatar
376 posts
I routed an electric freight from Warrington BQ into Arpley Sidings as a test for a new timetable and received the message "4M38 has reached the end of electrification". This surprised me! At least as far back as 1990 and I think even when Warrington PSB ws opened, the three roads accessible directly in the Up direction were all electrified. Or am I missing something super-subtle in SimSig?
Last edited: 17/02/2021 at 01:16 by whatlep
Reason: None given

Log in to reply
Warrington PSB FAQ 17/02/2021 at 07:15 #137308
JamesN
Avatar
1568 posts
whatlep in post 137306 said:
I routed an electric freight from Warrington BQ into Arpley Sidings as a test for a new timetable and received the message "4M38 has reached the end of electrification". This surprised me! At least as far back as 1990 and I think even when Warrington PSB ws opened, the three roads accessible directly in the Up direction were all electrified. Or am I missing something super-subtle in SimSig?
Mantis 33072 for investigation

Log in to reply
The following user said thank you: whatlep
Warrington PSB FAQ 17/02/2021 at 08:56 #137309
kbarber
Avatar
1707 posts
JamesN in post 137308 said:
whatlep in post 137306 said:
I routed an electric freight from Warrington BQ into Arpley Sidings as a test for a new timetable and received the message "4M38 has reached the end of electrification". This surprised me! At least as far back as 1990 and I think even when Warrington PSB ws opened, the three roads accessible directly in the Up direction were all electrified. Or am I missing something super-subtle in SimSig?
Mantis 33072 for investigation
Electrically-hauled freight certainly ran in & out of Arpley when I was in the Brent (1983 - 85).

Log in to reply
Warrington PSB FAQ 17/02/2021 at 09:18 #137311
jc92
Avatar
3625 posts
JamesN in post 137308 said:
whatlep in post 137306 said:
I routed an electric freight from Warrington BQ into Arpley Sidings as a test for a new timetable and received the message "4M38 has reached the end of electrification". This surprised me! At least as far back as 1990 and I think even when Warrington PSB ws opened, the three roads accessible directly in the Up direction were all electrified. Or am I missing something super-subtle in SimSig?
Mantis 33072 for investigation
32673 already raised and resolved for the next release

"We don't stop camborne wednesdays"
Log in to reply
The following user said thank you: whatlep
Warrington PSB FAQ 27/02/2021 at 15:41 #137498
HST125Scorton
Avatar
1125 posts
I have an issue regarding Warrington RMT, Train 1M02 Shieldmuir - Warrington Royal Mail has arrived into Platform 1 via Platform 2 as its 240m (12/325) where it forms 1S02 back to Shieldmuir. Upon arrival I cancel Signal 137 [P2] but the overlap after Signal 138 [P1] locking Point Set (P805) won't clear. I tried to clear the overlap but still there is this a sim issue or an issue on my behalf. Would it also be best to add Platform 2A1 along with 1A2 to the timetable editor?



Post has attachments. Log in to view them.
Aaron (AJRO) | Timetable Writer
Last edited: 27/02/2021 at 15:42 by HST125Scorton
Reason: None given

Log in to reply
Warrington PSB FAQ 27/02/2021 at 17:04 #137499
pedroathome
Avatar
880 posts
HST125Scorton in post 137498 said:
I have an issue regarding Warrington RMT, Train 1M02 Shieldmuir - Warrington Royal Mail has arrived into Platform 1 via Platform 2 as its 240m (12/325) where it forms 1S02 back to Shieldmuir. Upon arrival I cancel Signal 137 [P2] but the overlap after Signal 138 [P1] locking Point Set (P805) won't clear. I tried to clear the overlap but still there is this a sim issue or an issue on my behalf

Logged as Mantis 0033210 and fixed.

Last edited: 27/02/2021 at 17:05 by pedroathome
Reason: None given

Log in to reply
The following user said thank you: HST125Scorton
Warrington PSB FAQ 05/07/2021 at 19:24 #140369
HST125Scorton
Avatar
1125 posts
I have a handful of locos that run round its train at the RMT Terminal, So I edited the timetable to add both Warrington RMT Rev 166 & Warrington RMT Rev 173 but when validating it pops up Next Key Locations. Am I doing this wrong?

OS: Windows 10 Enterprise 64bit
Loader: SimSig Loader version 5.16; Sim: Simulation Warrington PSB; data version 1.1
License: Dynamic license in use
TT: Warrington PSB Easter 2021 v1.0.0
TT filename: Warrington PSB Easter 2021.WTT
TT merged: False
Sim upgrade: False
Loader upgrade: False
Save reloaded: False
NTORR_ENABLED active at start
NTORR active at start
NERA active at start
NERA_NEW active at start
NPROBLEMS active at start
NNONE active at start
NNORMAL active at start
NARPLEY_RUNROUND choice 1
NACTON_WARRINGTON choice 2
NGOLBORNE_WINWICK choice 3
NSPRB_GOLBORNE choice 4
NWARRINGTON_WINWICK choice 5
NWARRINGTON_PLATFORM choice 6
NWIGAN_NW_PLATFORM choice 7
NPICK_RANDOM_1 choice 8
NPICK_RANDOM_2 choice 9
NPICK_RANDOM_3 choice 10


Post has attachments. Log in to view them.
Aaron (AJRO) | Timetable Writer
Log in to reply
Warrington PSB FAQ 05/07/2021 at 19:59 #140372
pedroathome
Avatar
880 posts
HST125Scorton in post 140369 said:
I have a handful of locos that run round its train at the RMT Terminal, So I edited the timetable to add both Warrington RMT Rev 166 & Warrington RMT Rev 173 but when validating it pops up Next Key Locations. Am I doing this wrong?

Mantis 33956. Looks like I got all the other paths, just not this one

Log in to reply
The following user said thank you: HST125Scorton
Warrington PSB FAQ 07/07/2021 at 15:24 #140437
whatlep
Avatar
376 posts
Compliments to those involved in the recent update of WBQ. The addition of Garswood reversal facilities is much appreciated! One thing I'm still struggling with and it may be so blindingly obvious I'll be embarrassed. Simply, what's the sequence of locations required to schedule a train from Wigan North Western to Bickershaw Colliery?

Thanks in advance. A heritage (1977) timetable is in development....

Log in to reply
The following user said thank you: bossman
Warrington PSB FAQ 07/07/2021 at 16:27 #140440
Steamer
Avatar
3911 posts
whatlep in post 140437 said:
Compliments to those involved in the recent update of WBQ. The addition of Garswood reversal facilities is much appreciated! One thing I'm still struggling with and it may be so blindingly obvious I'll be embarrassed. Simply, what's the sequence of locations required to schedule a train from Wigan North Western to Bickershaw Colliery?
Looks like it's missing. Mantis 33992 raised.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: whatlep
Warrington PSB FAQ 07/07/2021 at 22:08 #140451
pedroathome
Avatar
880 posts
pedroathome in post 140372 said:
HST125Scorton in post 140369 said:
I have a handful of locos that run round its train at the RMT Terminal, So I edited the timetable to add both Warrington RMT Rev 166 & Warrington RMT Rev 173 but when validating it pops up Next Key Locations. Am I doing this wrong?

[quote=whatlep;post=140437]Compliments to those involved in the recent update of WBQ. The addition of Garswood reversal facilities is much appreciated! One thing I'm still struggling with and it may be so blindingly obvious I'll be embarrassed. Simply, what's the sequence of locations required to schedule a train from Wigan North Western to Bickershaw Colliery?

Thanks in advance. A heritage (1977) timetable is in development....


Paths added for both of the above, and will be in an update.

I can't remember all timing points, but should be Springs Branch, followed by Bickershaw Collery. If it needs to be Springs Branch Junction as well, let me know and I'll adjust the path.

James

Log in to reply
The following user said thank you: whatlep
Warrington PSB FAQ 20/10/2021 at 18:23 #141966
cdoward
Avatar
24 posts
A couple of things I've noticed:

The first is to do with trains routed via the Up Goods at Warrington Bank Quay in the 1972-2009 era.
At signal 174, you get the message shown next to 6M25 in the Warrington 6M25 F2 file that should be attached. I've also included the timetable for 6M25 at Warrington, so you can see what is intended. You do get an error message to say that the train is wrongly routed, I was intending to abandon the timetable for 6M25 and see if you could get round it that way but the train decided to start detaching the loco. I will add an edit when I know further.

The second point is following on from electric trains using Arpley Sidings as mentioned further up this topic, should this also apply to Walton Traffic Sidings for the 1972-2009era, if you try to route an AC loco-hauled train in or out you get a wrong traction message. I did try to find a photo, if you have Paul Shannon's Speedlink book the front cover and page 59 of the book illustrate this.



Post has attachments. Log in to view them.
Last edited: 20/10/2021 at 18:24 by cdoward
Reason: None given

Log in to reply
Warrington PSB FAQ 20/10/2021 at 18:40 #141967
Steamer
Avatar
3911 posts
cdoward in post 141966 said:

The first is to do with trains routed via the Up Goods at Warrington Bank Quay in the 1972-2009 era.
At signal 174, you get the message shown next to 6M25 in the Warrington 6M25 F2 file that should be attached. I've also included the timetable for 6M25 at Warrington, so you can see what is intended. You do get an error message to say that the train is wrongly routed, I was intending to abandon the timetable for 6M25 and see if you could get round it that way but the train decided to start detaching the loco. I will add an edit when I know further.
I assume this is a timetable you've written yourself, and not one that's supplied with the simulation?

The train needs 'Thru line stop' at Bank Quay ticked, or it'll want to use a platform line. It also appears to be flagged as a regulating stop, I'm not sure if this is advised if the train also has activities.

Quote:
The second point is following on from electric trains using Arpley Sidings as mentioned further up this topic, should this also apply to Walton Traffic Sidings for the 1972-2009era, if you try to route an AC loco-hauled train in or out you get a wrong traction message. I did try to find a photo, if you have Paul Shannon's Speedlink book the front cover and page 59 of the book illustrate this.
The traffic sidings aren't electrified; only the MSC sidings and Arpley Yard.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: cdoward
Warrington PSB FAQ 20/10/2021 at 18:59 #141968
cdoward
Avatar
24 posts
Steamer in post 141967 said:
cdoward in post 141966 said:

The first is to do with trains routed via the Up Goods at Warrington Bank Quay in the 1972-2009 era.
At signal 174, you get the message shown next to 6M25 in the Warrington 6M25 F2 file that should be attached. I've also included the timetable for 6M25 at Warrington, so you can see what is intended. You do get an error message to say that the train is wrongly routed, I was intending to abandon the timetable for 6M25 and see if you could get round it that way but the train decided to start detaching the loco. I will add an edit when I know further.
I assume this is a timetable you've written yourself, and not one that's supplied with the simulation?

The train needs 'Thru line stop' at Bank Quay ticked, or it'll want to use a platform line. It also appears to be flagged as a regulating stop, I'm not sure if this is advised if the train also has activities.

Quote:
The second point is following on from electric trains using Arpley Sidings as mentioned further up this topic, should this also apply to Walton Traffic Sidings for the 1972-2009era, if you try to route an AC loco-hauled train in or out you get a wrong traction message. I did try to find a photo, if you have Paul Shannon's Speedlink book the front cover and page 59 of the book illustrate this.
The traffic sidings aren't electrified; only the MSC sidings and Arpley Yard.
Yes, it is a timetable I'm working on myself. I'd completely overlooked the through line stop at Warrington Bank Quay. THe train is booked to be regulated at Warrington Bak Quay in the WTT. I'll see what happens.

I've added the cover from Paul Shannon's Speedlink book from the internet. I presume the MGR's just visible to the left of the 90 are in the MSC Sdgs and that 90039 is in the Traffic Sidings or Walton Old Jn Sdgs (Quail/4: LMR 1990. Photo is dated 27 June 1991.

Post has attachments. Log in to view them.
Last edited: 20/10/2021 at 19:18 by cdoward
Reason: Additional text and attachment added.

Log in to reply
Warrington PSB FAQ 20/10/2021 at 20:21 #141969
Steamer
Avatar
3911 posts
cdoward in post 141968 said:

Yes, it is a timetable I'm working on myself. I'd completely overlooked the through line stop at Warrington Bank Quay. THe train is booked to be regulated at Warrington Bak Quay in the WTT. I'll see what happens.
In SimSig, if it's flagged as a regulating stop, the train will continue through if the signal is clear and won't stop. I'm not sure how the activities will interact with this- you might want to test it and make sure it behaves correctly if 195 is clear when the train arrives in the loop. To be safe, set it as a normal stop, the train might still ring for departure early anyway.

Quote:
I've added the cover from Paul Shannon's Speedlink book from the internet. I presume the MGR's just visible to the left of the 90 are in the MSC Sdgs and that 90039 is in the Traffic Sidings or Walton Old Jn Sdgs (Quail/4: LMR 1990. Photo is dated 27 June 1991.
I stand corrected; also dug up a clearer photo here: https://www.flickr.com/photos/71592768@N08/11821092434 Logged on Mantis, #34959

Do you know when the wires were removed, by any chance? A photo dated 2003 shows the yard without wires.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: cdoward
Warrington PSB FAQ 21/10/2021 at 04:06 #141971
cdoward
Avatar
24 posts
Unfortunately I don't. I would presume mid to late 90's after the end of Speedlink.
Log in to reply
Warrington PSB FAQ 15/01/2022 at 15:25 #143556
HST125Scorton
Avatar
1125 posts
Is there a way of seeding a train at Newton-le-Willows towards Earlestown? I have 2F21 that seeds at the timetable start using Signal 538 to go towards Platform 2 at Earlestown. Unfortunately with the signal been quite a distance from the station it won't pick up its at Newton-le-Willows same happened the other way towards Parkside Jn at signal 533. Would be handy if the platform numbers were listed and platforms seeded in the list of seeds etc like Wigan P3.
Aaron (AJRO) | Timetable Writer
Log in to reply
Warrington PSB FAQ 15/01/2022 at 16:02 #143557
y10g9
Avatar
895 posts
But unlike Wigan, there is not a platform starter for the train to seed at. Have you tried using the seeding gap? Seed the train at the signal and then adjust the gap so it seeds in the platform.
Log in to reply
The following user said thank you: HST125Scorton
Warrington PSB FAQ 15/01/2022 at 16:07 #143558
Steamer
Avatar
3911 posts
y10g9 in post 143557 said:
But unlike Wigan, there is not a platform starter for the train to seed at. Have you tried using the seeding gap? Seed the train at the signal and then adjust the gap so it seeds in the platform.
To be slightly more accurate, the Wigan locations (and Warrington loco siding) are for seeding at the platform buffer stops, not the platform starter (seeding at the starter is possible as well, using the signal number as elsewhere).

An alternative is to seed at the signal before NLW and let the train pick up the stop there, or seed after NLW and omit the stop from the timetable.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following users said thank you: HST125Scorton, pedroathome
Warrington PSB FAQ 04/02/2022 at 23:50 #145000
HST125Scorton
Avatar
1125 posts
In the timetable editor and locations, I have noticed Lowton Junction is missing between Newton-le-Willows and Golbourne Junction. Having said that not many trains actually use the location unless its a Notional activity for WTT. I have a handful of trains that need Lowton Jn for regulation purposes but doesn't affect the timetables.
Aaron (AJRO) | Timetable Writer
Log in to reply
Warrington PSB FAQ 20/03/2022 at 11:44 #145790
HST125Scorton
Avatar
1125 posts
It would seem timetables don't step up once they pass Ince Moss Junction from the Bamfurlong Junction area using the single line. Trains from St Helens Central step up as normal going south but not going towards St Helens Central.

I have provided a screenshot but not a snapshot save file as this is a WIP timetable.

OS: Windows 10 Enterprise 64bit
Loader: SimSig Loader version 5.19; Sim: Simulation Warrington PSB; data version 1.2
License: Dynamic license in use
TT: Warrington PSB [Retracted] v1.2.0
TT filename: Warrington PSB [Retracted].WTT
TT merged: False
Sim upgrade: False
Loader upgrade: False
Save reloaded: True
NTORR_ENABLED active at start
NTORR active at start
NERA active at start
NERA_NEW active at start
NPROBLEMS active at start
NNONE active at start
NNORMAL active at start
NARPLEY_RUNROUND choice 1
NACTON_WARRINGTON choice 2
NGOLBORNE_WINWICK choice 3
NSPRB_GOLBORNE choice 4
NWARRINGTON_WINWICK choice 5
NWARRINGTON_PLATFORM choice 6
NWIGAN_NW_PLATFORM choice 7
NPICK_RANDOM_1 choice 8
NPICK_RANDOM_2 choice 9
NPICK_RANDOM_3 choice 10

Post has attachments. Log in to view them.
Aaron (AJRO) | Timetable Writer
Last edited: 20/03/2022 at 11:45 by HST125Scorton
Reason: None given

Log in to reply
Warrington PSB FAQ 20/03/2022 at 21:26 #145794
headshot119
Avatar
4869 posts
I've logged 35908 to investigate, however without a savegame, or a full timetable schedule it's hard to narrow down exactly what has gone on.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Warrington PSB FAQ 22/03/2022 at 15:52 #145823
HST125Scorton
Avatar
1125 posts
headshot119 in post 145794 said:
I've logged 35908 to investigate, however without a savegame, or a full timetable schedule it's hard to narrow down exactly what has gone on.
Provided two snapshot of 0Z52 Before Bamfurlong and just before Ince Moss Jn waiting for 2C20 to pass in front.

Post has attachments. Log in to view them.
Aaron (AJRO) | Timetable Writer