Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Doncaster North Released & Updates

You are here: Home > Forum > Announcements > Permanent announcements > Doncaster North Released & Updates

Page 1 of 1

Doncaster North Released & Updates 27/11/2021 at 19:18 #142496
headshot119
Avatar
4869 posts
Doncaster PSB (North) Released

Everyone loves a new simulation, and that’s why we’re excited to announce part two of Doncaster PSB has been released. This one covers Panels 4 and 5 of Doncaster PSB.

Heavy on both freight and passenger trains, you control a mixture of the ECML and various other lines which branch away from it.

You are in control from just outside Doncaster station through to Temple Hirst Junction, as well as the lines to Scunthorpe, Ferrybridge, South Elmsall, and the north part of the South Yorkshire Joint line which avoids Doncaster station.

The simulation covers a number of eras, and comes with timetables for 2009, 2015 and 2019.

Chaining is possible to York North / South, West Yorkshire, and Leeds Ardsley.

Loader Update
Notably there is now an option provided in F3 to set if you’d prefer simulations to default to paused on startup or not, the default case remains the same as previously.

Users will also be prompted to login if they select a simulation which requires a license and they haven’t already done so.

Fixes to how long routes work in multiplayer (which mainly affects the Australian simulations) for clients.

As always there are various minor bug fixes, check the change log for further details.

Other Updates
Alongside the release of Doncaster North and the loader, there’s an extensive bundle of simulation and timetable updates. Most of these are relatively minor in nature, and a full list of the changes to simulations can be found in the relevant change logs on the wiki.

Notably simulation updates to Edge Hill, Warrington PSB, Cheshire Lines, Manchester South, Staffordshire, Shrewsbury, and Chester are all to provide chaining compatibility to the forthcoming Crewe simulation. There’s some more information about a mega chain game involving Crewe after the new year available in this thread.


Simulation Updates
Birmingham New Street
Cheshire Lines
Chester
Coventry
Doncaster South
Edge Hill
Hereford
Leeds Ardsley
Leeds North West
London Bridge ASC
London Bridge ASC Mini
Manchester South
Shrewsbury
Staffordshire
Warrington
West Yorkshire
York North South

Timetable Updates
Aston 2015
Birmingham New Street 2015
Cheshire Lines 2015
Chester 2015 / 2019
Coventry 2015
Doncaster South 2015 / 2019
Edge Hill 2015
Huddersfield 2015
Huyton 2015
London Bridge ASC 2009
Manchester East 2015
Manchester North 2015
Manchester Piccadilly 2015
Manchester South 2015
Sheffield 2015 / 2019
Staffordshire 2015
Stockport 2015
Warrington 2009 / 2015 / 2019

Misc
Ground Frame Diagrams on Moss Vale
Ground Frame Diagram for West Yorkshire

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Last edited: 27/11/2021 at 20:16 by headshot119
Reason: .

Log in to reply
The following users said thank you: HST125Scorton, andyallen4014, JamesDaniel, tjfrancis, geswedey, bossman, phil1044, Hap, Steamer, 58050, Dionysusnu, Forest Pines, zandoodle, Soton_Speed, Razzabazza123, Gwasanaethau, simonstops, Phil-jmw, flabberdacks, Chrisrail, WesternChampion, TrainMartin, Albert, Redbusman, alan_s, snapscan, iainsheppard