You are here: Home > Files > User-contributed > Timetables > Leeds East / West > File Details - Leeds East-West Oct 2018
LEEDS EAST-WEST
================
Leeds East/West timetable of trains that actually ran during the fist week in October 2018.
Timetable and train info from Official CIF files, WTT's & TRUST.
Chains with : Leeds North-West, Leeds Ardsley, West Yorkshire
Multi Seed : Yes with 00:00 and 04:45 starts
Timeatbled Trains : 1885
Rules : 469
Decisions : 1
Train Types : 115
Rules have been applied to stop sets returning earlier than is possible when the oubound train is late or in times of disruption.
Rules as well as dwell and turnaround times are as per Network Rail's Rules Of The Route document.
The "Derby Dig" was in its final stages, so there were still some retimings of XC and EMT services during this week.
This is a Mon-Fri Timeatable, with many freight trains only ran on certain days so a different timetable should appear each time you run it.
Plaese read this simulation's instruction manual thoroughly form the SimSig website, easpecially regarding ARS movements around the station, and in addition please note the following before starting the timetable :
ARS:
Seeding :
ARS wont interpose 2C06 from Plat 5.
You will need to interpose 2C06 manually behind 1B15 once 2N00 departs @ 0534
ARS wont interpose 5L99 correctlly on arrival @ 0546.
This train divedes into three portions on arrival and you will need to do the following manually.
2L99 will have to be interposed manually once the train arrives.
5S02 will have to be interposed manually after 2L99 departs.
5C61 Shunt P 11d to P7 :
ARS doesnt interpose 5C61 off 2C61 arrival @ 1844. This will have to be done manually, and make 5C61 non-ARS because if you dont it gets priority over everything until it leaves P7 @ 2131 ! Also leave it as non-ARS until it arrives in the through road.
ARS often gives priority to later departures from Leeds Plats 1- 6 departing over line B, For example a Skipton train will get priority over an Ilkey service which leaves 3 mins after the Ilkely train. Be wary of this and you will need to set the route for the Ilkley train manually.
ARS quite often gives a train into Plat 10 priority over one into Plat 12d (for example) booked to arrive earlier, which will cause the train for 12d to be held at the previous signal until the train enters P10.
Sobe wary of this when platforming services, as you may have hold the train booked into P10 outside to give the train into P12d precidence.
The following are known to do the above on testing :
1F74 @ 0008
5J35 @ 0011
1V96 @ 1607
2W25 @ 1659
1V93 @ 1707
1O94 @ 1809
2C61 @ 1844
1Y26 @ 1914
1A56 @ 2317
1K40 @ 2320
2F76 @ 2347
LNER:
The following trains were temporarly cancelled by LNER Control under "Performance pre planned cancellations"
1D07-1A28 and 1D19-1A45
Thanks :
======
Thanks go to Geoff Mayo for creating SimSig in the first place, and for the developing of Leeds East West.
Enjoy and please advise me of any errors found that are not listed above via the forum as the timetable is complex with many scenarios, so some errors may appear despite thorough testing.
Timetable written by Phil Hodgson (Phil1044)
Timetable Versions :
==================
09 March 2019 : v 1.0.0 Timetable named Leeds East/West Summer 2018
12 October 2020 : v 3.0.0 Multi Seed added, Official CIF numbers added, and All trains that actually ran on 1st-5th Oct have been included. Name changed To Leeds East-West Oct 2018
05 January 2021 : v 5.0.0 Changes to make chainable with West Yorkshire timetable from the same date. Minor timetable corrections to several serves, Charter trains added. Some Train Types corrected.
Download | Edit | Back to List