Page 22 of 31
Forthcoming Timetables 06/04/2021 at 14:11 #138429 | |
officer dibble
407 posts |
Manchester Piccadilly - Thursday 15/10/2020 (11th anniversary of the original GH day TTs). Sheffield - Wednesday 03/03/2021. Both are being given a run through now. When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Log in to reply |
Forthcoming Timetables 07/04/2021 at 15:25 #138442 | |
phil1044
161 posts |
Ive been busy putting together a West Midlands 5 day "as it happened" chain from November 2020. This will include New Street, Aston, Wolverhampton, Coventry and Leamington Spa. Only New Street is to complete at the moment, with all others being under test in the meantime (many thanks go to Andy Allen for his testing and patience). I don't have definate date for release yet, as New Street is very complicated and will take a while to test the various combinations. It'll be worth it tho ! Phil... Log in to reply The following users said thank you: andyallen4014, TrainMartin, Mikhail, haydenrobertson, Rossy, ajax103, HST125Scorton, Ginger |
Forthcoming Timetables 11/04/2021 at 14:54 #138528 | |
HST125Scorton
1186 posts |
HST125Scorton in post 138426 said:Also to note there is a three day timetable in the works from myself for Warrington PSB starting on Thursday 1st and ending on Saturday 3rd April during the Easter 2021 Engineering Period.Timetable is now complete with over 1200 trains over the 3 day period, it will now go under testing by myself and hopefully won't be too long until I release it Aaron (AJRO) | Timetable Writer Log in to reply The following users said thank you: Chrisrail, Mikhail |
Forthcoming Timetables 12/04/2021 at 15:14 #138555 | |
welshdave257
42 posts |
I've started writing two timetables for Port Talbot. One based on a day earlier this month and a completely fictional one. The fictional one also has a new passenger service (not likely to happen in the real world, alas!). I think I have enough data to write the real one, although I don't have a clue about some of the freight consists (number/type of wagons etc). Early stages right now, and I'm mainly doing this to see if I can even write them to begin with, but so far, so good. Log in to reply |
Forthcoming Timetables 12/04/2021 at 17:45 #138560 | |
HST125Scorton
1186 posts |
My next timetable is based at Carlisle with another yearly instalment of passenger, freight and hopefully charter workings. I have yet to decide on which days or in turn whether a 2 or 3 day timetable would be worth the work but we will see. Please note that while I'm doing this new timetable I will also be testing the Warrington Easter 2021 timetable recently done including a house move in between.
Aaron (AJRO) | Timetable Writer Log in to reply |
Forthcoming Timetables 12/04/2021 at 21:06 #138561 | |
Newhampshires
101 posts |
welshdave257 in post 138555 said:I've started writing two timetables for Port Talbot. One based on a day earlier this month and a completely fictional one. The fictional one also has a new passenger service (not likely to happen in the real world, alas!). I think I have enough data to write the real one, although I don't have a clue about some of the freight consists (number/type of wagons etc).Hi Welshdave257! I just wanted you to know that on Friday I submitted a timetable for Port Talbot that shows the April 2, 2021 services. Also I will message you the sites I used when writing my timetable so you can know of them too. Writing timetables is fun - Enjoy! Log in to reply The following user said thank you: welshdave257 |
Forthcoming Timetables 12/04/2021 at 22:37 #138562 | |
Trainzy
7 posts |
Hi Guys. I’m working on a Cardiff Valley Lines weekday timetable based on a week in late March 2021. Was getting a little bored playing the available timetables on SimSig and noticed recently the WTT has changed with the Covid situation. Despite it still being a metro service, heavily reduced into the valleys though, there are lot more shuttles between Pontypridd, Caerphilly and Cardiff so it’s something different. Thinking with a higher difficulty might make the day interesting, otherwise it’ll be pretty quiet! I’m still writing the timetable, finished with the main bulk of of passenger services, just got to add the freight to Cwmbargoed and the driver training runs to Rhymney with the 769s when I have a day off next. After that a few runs of testing and if ok, I will upload it soon :) Trainzy Log in to reply The following users said thank you: welshdave257, Newhampshires |
Forthcoming Timetables 13/04/2021 at 08:05 #138563 | |
welshdave257
42 posts |
Brilliant! Cheers for that. I'll keep an eye out for your TT. I picked Easter Monday (5th April). And yep, so far I'm enjoying it
Log in to reply |
Forthcoming Timetables 18/04/2021 at 16:21 #138777 | |
Newhampshires
101 posts |
Paisley - April 2021 Expected release date: May 2021 Log in to reply |
Forthcoming Timetables 19/04/2021 at 09:30 #138805 | |
tynie123
234 posts |
Newhampshires in post 138777 said:Paisley - April 2021Great..and thanks i will be on it as soon as. Log in to reply The following user said thank you: Newhampshires |
Forthcoming Timetables 21/04/2021 at 17:15 #138895 | |
Splodge
716 posts |
Piccadilly - Easter Monday 2021 uploaded and awaiting approval. Quieter than my 'Ordsall Chord 2020' TT (1053 trains compared to 1696) but with added interest from diversions and longer train formations from various TOCs requiring care to be taken when platforming. There's the right way, the wrong way and the railway. Log in to reply The following user said thank you: Sidestick Priority |
Forthcoming Timetables 12/06/2021 at 22:02 #139962 | |
HST125Scorton
1186 posts |
A quick but complex update from myself regarding timetables and testing progress. During May 2021 I was down for relocating to Carlisle from the outskirts of Manchester but a few days before moving the home owner decided on cancelling our chances of moving so typically everything in boxes including all my work notes and timetable info and notes.. So was a right pain but we're still hopeful that we will end up into Carlisle soon. Anyway timetable updates below: Warrington PSB Easter 2021 - Three Day timetable, this timetable is complete with just over 6 hours on the final third day still to be tested. Warrington PSB Summer 2021 - Now this timetable although wasn't planned has been made to reflex how the real work timetable is at current including a heavy amount of freight traffic and the start of charters. This timetable is complete but not been tested. Others in work and near complete on writing are Carlisle PSB - 26th June 2021 Carlisle PSB - Summer 2021 Manchester South - Summer 2021 Staffordshire - Summer 2021 I do have in plan these but magical work arounds will be done Edge Hill-Lime Street - Summer 2021 - If an update does come along when it was all transferred to Manchester ROC then the timetable will be updated to reflect. Manchester North - Summer 2021 - Pending it's next release before I can complete it Aaron (AJRO) | Timetable Writer Last edited: 12/06/2021 at 22:03 by HST125Scorton Reason: None given Log in to reply The following users said thank you: Newhampshires, bossman, Mikhail |
Forthcoming Timetables 13/06/2021 at 07:56 #139966 | |
Newhampshires
101 posts |
Chester - Weekday - June 2021 Release date: July 2021 Log in to reply The following user said thank you: elltrain3 |
Forthcoming Timetables 13/06/2021 at 10:33 #139971 | |
58050
2657 posts |
Birmingham New Street summer 1990 TT is now under test. This TT is exetremly challenging & if you play it solo you will struggle to keep everything moving. Currently there are 1,191 trains in the TT, but this number may change before release. I'll post a thread on the forum regarding how to run the TT as the sim isn't quite up to a proper state for the era to work the TT without work arounds atm. But we are working to make it as easy for the user as possible. For those specifically interested in the BR era I would suspect that the TT will be sent for release at some point next month.
Log in to reply The following users said thank you: Splodge, tjfrancis, Dionysusnu, Rossy, mldaureol, sloppyjag, KymriskaDraken, bossman, ccobh, Mikhail, AlexH |
Forthcoming Timetables 13/06/2021 at 14:13 #139974 | |
bill_gensheet
1394 posts |
bill_gensheet in post 136913 said:casey jones in post 136911 said:The chainable CSCOT 1984 and Motherwell 1984 are now released. Edinburgh 1984 has a couple of gremlins to fix, and some breakdowns / failures to add before Edinburgh gets released as well.iam hoping a new timetable is being done for tyneside and edinburgh my favourite simsI have an Edinburgh 84 being tested now, chaining though is to CSCOT & Motherwell not southwards. As a 3-way chain it is a long job testing it. Should be out early July. Bill Log in to reply The following users said thank you: bossman, Mikhail, mldaureol, Soton_Speed |
Forthcoming Timetables 19/06/2021 at 14:16 #140092 | |
simple68
80 posts |
I have my Tyneside 2021 basically ready to go if anyone can give it a test and report back please. Thanks Si Post has attachments. Log in to view them. Log in to reply |
Forthcoming Timetables 05/07/2021 at 22:57 #140389 | |
9pN1SEAp
1171 posts |
There is a May 2021 TT for Edinburgh in the works, to complement the Carlisle to Dunblane series already released. It's proving a challenge due to the sim not reflecting remodelling and electrification, but we'll get there...
Jamie S (JAMS) Log in to reply |
Forthcoming Timetables 06/07/2021 at 01:52 #140390 | |
whatlep
377 posts |
With the extended version of Manchester North now available, including the whole of the Oldham loop and L&Y main line as far as the Preston interface, two timetables will shortly be available for download. Manchester North 2007 has been completely rewritten to cover all the new lines in Manchester North Manchester North 2002 is brand new, with more freight than 2007 and some subtle changes in the passenger services Keep an eye on the Downloads section for them! Log in to reply The following users said thank you: Phil-jmw, bossman, Javelin395 |
Forthcoming Timetables 06/07/2021 at 17:30 #140425 | |
headshot119
4869 posts |
whatlep in post 140390 said:With the extended version of Manchester North now available, including the whole of the Oldham loop and L&Y main line as far as the Preston interface, two timetables will shortly be available for download.These are now approved It was a pleasure Peter to get a sneak preview while the extended North was in development! "Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer Log in to reply The following user said thank you: whatlep |
Forthcoming Timetables Tyneside 07/07/2021 at 09:46 #140436 | |
mask44
31 posts |
Morning Simple I am currently playing your Tyneside timetable. Just one problem i have encounted 1N53 was trying to bypass Newcastle and head down the goods line at Tyne Yard , the message i was given was Booked via Norwood Junction thx Log in to reply |
Forthcoming Timetables 08/07/2021 at 14:14 #140475 | |
TimTamToe
663 posts |
mask44 in post 140436 said:Morning SimpleI really hope there's another Norwood Jcn up north, otherwise that's quite a detour down to Croydon Log in to reply |
Forthcoming Timetables 18/07/2021 at 12:49 #140638 | |
Dionysusnu
576 posts |
I'm currently writing my first timetable, Westbury 2021-07-07. It will include what was timetabled to run that day, including any cancelled freight workings. It also includes the VSOE pullman charter. I expect it to be ready for testing in around 2 weeks. Log in to reply The following user said thank you: samrammstein |
Forthcoming Timetables 19/07/2021 at 18:08 #140656 | |
HST125Scorton
1186 posts |
A quick but complex update from myself regarding timetables and testing progress. It's a hot summer and while the sun burns its way around the country I'm still plodding along nicely with timetables, below is the update. The ones in the update column have been updated to use the new Set Down features and also general fixes from various reports. Completed Carlisle PSB - 26th June 2021 Carlisle PSB - 27th June 2021 In the Works: Carlisle PSB - Summer 2021 Manchester North - Autumn 2021 Planned: Manchester South Staffordshire Testing Phase: Warrington PSB - Acton Grange Block 2019 Warrington PSB - Easter 2021 Warrington PSB - Summer 2021 Updates: Carlisle PSB - Autumn 2016 Carlisle PSB - Summer 2017 Carlisle PSB - September 2017 - Tyne Valley Diverts Carlisle PSB - Summer 2018 Carlisle PSB - September 2018 - Tyne Valley Diverts Carlisle PSB - Sunday 2018 Carlisle PSB - June Two-Day 2019 Carlisle PSB - August 2020 Carlisle PSB - September 2020 - Tyne Valley Diverts Wigan Wallgate - 19th May 2021 These above will be updated on SimSig Downloads section soon. Aaron (AJRO) | Timetable Writer Log in to reply |
Forthcoming Timetables 19/07/2021 at 20:20 #140657 | |
simple68
80 posts |
mask44 in post 140436 said:Morning Simple Hi Mask - I think there has been a reply to this now - I've not had a chance to look at it yet. It maybe a Sim issue more than the tt Si Log in to reply |
Forthcoming Timetables 19/07/2021 at 20:28 #140658 | |
simple68
80 posts |
TimTamToe in post 140475 said:mask44 in post 140436 said:There is - Its Just outside Newcastle!Morning SimpleI really hope there's another Norwood Jcn up north, otherwise that's quite a detour down to Croydon ;) Log in to reply |