Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Leeds Power Box 1991.

You are here: Home > Forum > Miscellaneous > The real thing (signalling) > Leeds Power Box 1991.

Page 1 of 1

Leeds Power Box 1991. 25/04/2016 at 00:22 #81991
ozrail
Avatar
197 posts
Leeds Power Box March 1, 1991. Located on upper floor of station building.

https://youtu.be/w2b5dr0wYis

Log in to reply
Leeds Power Box 1991. 28/04/2016 at 20:19 #82016
john_s
Avatar
31 posts
thank you very much for this.

A question - why do we see some white route lights flash on briefly then off? (e.g. near 1:34) Or is this something to do with route cancelling, but the red lights do not show up so well in the film?

Log in to reply
Leeds Power Box 1991. 28/04/2016 at 20:28 #82017
Steamer
Avatar
3929 posts
" said:

A question - why do we see some white route lights flash on briefly then off? (e.g. near 1:34) Or is this something to do with route cancelling, but the red lights do not show up so well in the film?
It looks like the track circuits in question were occupied, and as they cleared the white route lights remain briefly before clearing. If you watch closely (and run at real time or slower), you can see it happening on SimSig.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: john_s
Leeds Power Box 1991. 29/04/2016 at 08:52 #82031
kbarber
Avatar
1713 posts
" said:
" said:

A question - why do we see some white route lights flash on briefly then off? (e.g. near 1:34) Or is this something to do with route cancelling, but the red lights do not show up so well in the film?
It looks like the track circuits in question were occupied, and as they cleared the white route lights remain briefly before clearing. If you watch closely (and run at real time or slower), you can see it happening on SimSig.

That is what happens. I've seen it on every panel I've visited. The approach locking holds the route until cleared down, section by section, and every section of route that's held is indicated by the white route lights. As each section (usually an individual track circuit) clears, the approach locking relays take a moment to respond (there's quite a few relays in the system and, being cascaded, each one depends on the preceding one having operated). Some panels are quicker than others (and of course it depends on the entrance button having been pulled up in any case, unless it's a TORR panel).

Log in to reply
The following user said thank you: john_s