Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Who's Online

You are here: Home > Files > User-contributed > Timetables > Fenchurch Street > File Details - LTS Fenchurch - Summer 2020 4-Day Timetable

File Details - LTS Fenchurch - Summer 2020 4-Day Timetable

Title
LTS Fenchurch - Summer 2020 4-Day Timetable
Description

Based on RTT information for planned workings 31st July - 3rd August 2020. Seeds added for the start of each working day.

New Layout, Full Signalling Controls, Add Missing Routes and Add Missing Paths should all be enabled for this scenario to be compatible.

This is a back-port of the timetable for the LTS sim with some minor compatibility tweaks.

ARS Known Issues:
- Certain ECS recessing at Gas Factory Loop tends to get pulled off too early, putting UR128 on auto can help you.
- Sometimes, trains exiting East Ham EMUD need the points release slot pressed manually if the ARS has not requested it in a timely manner.
- There is no ACI at Upney Junction, 5Jxx services terminating there will need to be interposed manually.

Hacks and Special Notices:
- Barking P1 is electrified in real life but not on the sim, so some 710 consists are set to Diesel. The intended platform is shown in F2 - don't route one marked P7/P8 into P1.

Change History:
20221002 v1.1 - Initial Release
20221231 v1.2 - Minor corrections

Category
User-contributed > Timetables > Fenchurch Street
Published
Status
Approved
Submitted
31/12/2022 at 18:26
Submitted By
9pN1SEAp
Number of Downloads
306
Version
1.2.31
File Size
173.8 KiB
File Name
LTS Fenchurch - Summer 2020 4-Day Timetable.WTT

Download | Edit | Back to List