You are here: Home > Files > User-contributed > Timetables > West Hampstead > File Details - WK35 WH PSB Winter 2022 Timetable
West Hampstead PSB - Winterr 2022 ASLEF + Kentish Town Blockade timetable.
This timetable is based partly on the final Saturday of November 2022, with East Midlands Railway Intercity/Connect services withdrawn from the timetable due to ongoing ASLEF Industrial Action. In addition, albeit fictional on the above date, engineering works in the Thameslink Core between St Pancras Low Level - London Blackfriars would mean Thameslink services woud terminate/start from the High Level platforms at St Pancras, with trains not serving Kentish Town due to platforms being occupied by engineering trains.
Some of the Freight and Charter operations included in this simulation are also additional to what ran on this day, with others being actual operations (not perfectly timed, but in the same path given).
OPERATION NOTES:
1- Any passengers travelling to Kentish Town would have the option of a Rail Replacement Bus service from either St Pancras or West Hampstead Thameslink.
Download | Edit | Back to List