Exeter May Bank Holiday 2011 TT 30/05/2011 at 20:42 #3119
Sam Tugwell
Avatar
493 posts
Hello Simsig world.

Karl Latham (headshot119) and myself have began to compose a 2011 TT for the Bank Holiday weekend at the end of May 2011. Karl has began work on both the local and fast FGW and Cross Country Services, whilst I have started the South West Trains services between Exeter St Davids and London Waterloo.

Updates will be posted here.

"Signalman Exeter"
Log in to reply
Exeter May Bank Holiday 2011 TT 30/05/2011 at 20:42 #16170
Sam Tugwell
Avatar
493 posts
Hello Simsig world.

Karl Latham (headshot119) and myself have began to compose a 2011 TT for the Bank Holiday weekend at the end of May 2011. Karl has began work on both the local and fast FGW and Cross Country Services, whilst I have started the South West Trains services between Exeter St Davids and London Waterloo.

Updates will be posted here.

"Signalman Exeter"
Log in to reply
Exeter May Bank Holiday 2011 TT 31/05/2011 at 00:57 #16176
headshot119
Avatar
4869 posts
Quick updates. It's now 02:00 ish in the morning and I have been working solidly since around 19:00 time has flown. There are now 108 trains in the sim, 107 of which relate to the Exmouth - Paignton - Barnstaple triangle. The 108th is a positioning move from Cardiff that was needed to form one of the peak diagrams.

Some thoughts from me so far.

There is no pattern to how today ran at all, although it was supposed to be a Saturday service everything was out by a couple of minutes at most places. Unit diagrams made no sense with several peak trains terminating at St James (sub-situated for Central in the sim (Known Bug)) running to St Davids and back then doing a shunt then heading back to Barnstaple or Paignton. Another cause for confusion was 2C77 which normally then forms a later service to Plymouth and then returns towards Bristol instead seemed to form an integral part of a peak Exmouth diagram. After some digging it was to do with the fact it was a bank holiday and Canton would have ended up with one to many sets for Tuesday morning. So this unit does a rather odd shunt at St Davids to get into platform one to depart to Exmouth.

What Next?

Well that will most likely be the XC services, though these didn't run normal Saturday diagrams today either with 2 X 220 vice HST on two diagrams. Sam Has finished the SWT services from Honiton and they will be added to the main file later today. Work will then start on FGW HST services, and finally the other FGW local services.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Exeter May Bank Holiday 2011 TT 31/05/2011 at 18:49 #16203
Sam Tugwell
Avatar
493 posts
Update: 31/05/11

The SWT services are now onto the main timetable. I have started work on the Cross Country services, and have reached 13:00 or so. Aim is to finish these by the end of today.
We have no date for the Alpha release, however, we would welcome people to test the timetable before release. Drop a reply here or PM either me or Karl.

"Signalman Exeter"
Log in to reply
Exeter May Bank Holiday 2011 TT 31/05/2011 at 23:50 #16215
headshot119
Avatar
4869 posts
Update:

All class 2 services which run through from or to Taunton are now in the timetable. This only now leaves a handful of 2EXX trains left to be added in. Sam has progressed further with the XC services and they should be finished within the next day. This will leave just the FGW HST services to be added in.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Exeter May Bank Holiday 2011 TT 01/06/2011 at 01:30 #16217
UKTrainMan
Avatar
1803 posts
Sam Tugwell said:
We have no date for the Alpha release, however, we would welcome people to test the timetable before release.
Need I even express my willingness to help out with the above?

Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for.
Log in to reply
Exeter May Bank Holiday 2011 TT 01/06/2011 at 15:01 #16233
headshot119
Avatar
4869 posts
Update:

I've spent an hour or so adding in the down FGW Hsts. The timetable is certainly starting to take shape now.

There are now 231 trains in the timetable.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Exeter May Bank Holiday 2011 TT 01/06/2011 at 15:13 #16234
moonraker
Avatar
353 posts
If the late terminating HST from Padd still runs it stables in Exeter New Yard overnight for a shore supply connection so it doesn't go flat. Just a heads up.
Log in to reply
Exeter May Bank Holiday 2011 TT 01/06/2011 at 15:51 #16236
jc92
Avatar
3631 posts
UKTrainMan said:
Sam Tugwell said:
We have no date for the Alpha release, however, we would welcome people to test the timetable before release.
Need I even express my willingness to help out with the above? :)
ditto

"We don't stop camborne wednesdays"
Log in to reply