Speed limits

You are here: Home > Forum > Simulations > Released > Wembley Main Line > Speed limits

Page 1 of 1

Speed limits 24/07/2014 at 19:48 #63096
Jan
Avatar
891 posts
Apart from the crossover at Willesden North Jn I've found another place with seemingly strange speed limits - the Up Fast at Camden Jn.
Trains are slowing down to 30 mph for track circuit TESC, and then, if they're routed towards line 'D', down to 25 mph on track ciruit TESB.

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
The following user said thank you: GeoffM
Speed limits 24/07/2014 at 20:07 #63097
Lardybiker
Avatar
771 posts
I've had reports and replicated myself some odd speed limits on the the latest test build of South Humberside as well with trains apparently slowing for what appears to be no reason. I thought it may be some incorrectly structured PSR's which South Humberside does use in places but now someone else on a completely diffirent sim has mentioned it, so I am wondering if there is more to this?

I'll take it up with Geoff when I speak to him next.

Log in to reply
Speed limits 24/07/2014 at 20:30 #63099
GeoffM
Avatar
6288 posts
Online
Corrected to 25 over 50, both tracks.
SimSig Boss
Log in to reply
Speed limits 25/07/2014 at 12:48 #63129
clive
Avatar
2738 posts
Developers should note that the debug pane includes the ability to show tracks with specific ranges of speed limit, so playing with that can show you things set wrong.
Log in to reply
Speed limits 25/07/2014 at 18:23 #63140
Danny252
Avatar
1461 posts
" said:
Apart from the crossover at Willesden North Jn...
It seems this didn't get picked up (it wasn't on Geoff's list of issues in another thread!), so I'll copy it across:


" said:
Willesden North Junction: The 2009 Sectional Appendix shows it as a double-tracked crossover at 15 mph, while from the 2012 edition onwards it is shown it as a single lead junction at 30 mph. In the sim, it is depicted with single lead crossovers, however only at 15 mph. Was there some intermediate period between 2009 and 2012 where despite the new layout only a reduced speed was permitted, or is this a data error?

Last edited: 25/07/2014 at 18:23 by Danny252
Log in to reply
Speed limits 25/07/2014 at 20:19 #63151
Jan
Avatar
891 posts
At the risk of being nitpicky B), here's another one: Shouldn't Wembley Yard North Departure allow 25 mph (curiously enough apparently including the crossover to the North Arrival)?
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Last edited: 25/07/2014 at 20:20 by Jan
Log in to reply
Speed limits 25/07/2014 at 21:03 #63154
GeoffM
Avatar
6288 posts
Online
" said:
" said:
Apart from the crossover at Willesden North Jn...
It seems this didn't get picked up (it wasn't on Geoff's list of issues in another thread!), so I'll copy it across:


" said:
Willesden North Junction: The 2009 Sectional Appendix shows it as a double-tracked crossover at 15 mph, while from the 2012 edition onwards it is shown it as a single lead junction at 30 mph. In the sim, it is depicted with single lead crossovers, however only at 15 mph. Was there some intermediate period between 2009 and 2012 where despite the new layout only a reduced speed was permitted, or is this a data error?
Ah, I did do that one.


" said:
At the risk of being nitpicky B), here's another one: Shouldn't Wembley Yard North Departure allow 25 mph (curiously enough apparently including the crossover to the North Arrival)?
Yes - one TC was wrong. Note that it's only 10mph within the yard so it only makes a couple of seconds difference by the time the rear end has made its way out! Fixed.

SimSig Boss
Log in to reply
The following user said thank you: Jan