East Boldon - Stopping/Non Stopping LC Controls

You are here: Home > Forum > Simulations > Released > Tyneside IECC > East Boldon - Stopping/Non Stopping LC Controls

Page 1 of 1

East Boldon - Stopping/Non Stopping LC Controls 11/10/2016 at 09:36 #86726
Andrew G
Avatar
548 posts
Can anybody explain the rationale of why these exist in both the Up & Down direction?

I fully understand whey they exist in the Down direction as there are 2 AHB crossings in advance of the Station and the use of the Stopping option delays the activation sequence to allow for a Station stop with Signal 6243 held at Danger until the activation sequence has completed.

However, in the Up direction there are no automated crossings in advance of the Station and looking at Google Blue House Lane is just a pedestrian crossing.

Log in to reply