Upcoming Games

No games to display

Add a game

Upcoming Events

Who's Online

Cowlairs 2016 timetable

You are here: Home > Forum > Simulations > Timetables > Cowlairs > Cowlairs 2016 timetable

Page 1 of 1

Cowlairs 2016 timetable 12/01/2018 at 01:18 #104989
bill_gensheet
Avatar
301 posts
A timetable for Cowlairs in 2016 is nearing completion now - it is the time with Queen St shut.

Not sure if it will be fun, stressful or boring yet - I'll find out when testing it.

It is about 500 trains, very little outside the 0500 - 2300 period so I may well provide either a 'late start' option or a 'backshift start' at say 1400.


Bill

Log in to reply
The following users said thank you: Albert, Hap
Cowlairs 2016 timetable 24/02/2018 at 20:59 #106132
bill_gensheet
Avatar
301 posts
First test run and edit done, now on second testing run.

From the first run, this is likely to suit those who run delays & failures as the timetable is very fragile (in strange places - like Cumbernauld).
There's enough variety with WHL services and freight turning up just when you think you have the hang of the standard clockface.

Going to be 0400 - 2800 as so little happens at night.
Comments invited on supplying a 1000 and/or 1400 start.

Bill

Log in to reply
The following user said thank you: Hap
Cowlairs 2016 timetable 24/02/2018 at 21:11 #106133
Hap
Avatar
134 posts
Bill,, i assume there's no issues with the EGIP layout at Grenhill? this is still the old track layout in sim. the line to greenhill lower is no in place of the loop.

Craig

EDIT

Ignore me, i'm thinking CENT SCOT.

HAP
Last edited: 24/02/2018 at 21:13 by Hap
Reason: None given

Log in to reply