Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

0D07, TUT, BigAzza, geswedey (4 users seen recently)

Probable locking error at Warrington Central

You are here: Home > Forum > Simulations > Released > Hunts Cross & Glazebrook East > Probable locking error at Warrington Central

Page 1 of 1

Probable locking error at Warrington Central 25/07/2020 at 20:08 #129962
grahamj42
Avatar
130 posts
Track circuit TWC5 (Platform 1) locks 15 normal with 26 reverse and 27 reverse.
This is not the case for 13 (with 22 also reversed, of course).

Log in to reply
Probable locking error at Warrington Central 26/07/2020 at 00:32 #129969
JamesN
Avatar
1574 posts
I get the opposite

With TWC5 occupied I can set up a route from WC15, although the signal never clears
With TWC5 occupied I cannot set up a route from WC13

This in mechanical mode. In NX mode I can set either route with the platform track occupied, although again I cannot get the signal to ever clear

Reported on Bug Tracker Mantis as #31222

Log in to reply
The following user said thank you: grahamj42