Crossing Failure at Whittington AHBC (Line Speeds?)

You are here: Home > Forum > Simulations > Released > Shrewsbury > Crossing Failure at Whittington AHBC (Line Speeds?)

Page 1 of 1

Crossing Failure at Whittington AHBC (Line Speeds?) 03/06/2022 at 16:57 #146705
9pN1SEAp
Avatar
1102 posts
Hi,

Just had a class 6 train cause this error whilst running on the track circuit beyond the crossing on line DML (towards Gobowen). I think the train was running at 40mph at the time.

The train also took 31'01" to reach Gobowen whereas this train was planned to take 25 mins to complete the 18 miles SHR-GOB.

Has there been an uplift in primary line speeds since the date that the sim was set? And is the striking-out alarm prototypical as I can't see it in the manual?

Thanks
Jamie

Jamie S (JAMS)
Log in to reply
Crossing Failure at Whittington AHBC (Line Speeds?) 03/06/2022 at 17:32 #146706
bill_gensheet
Avatar
1318 posts
Mantis 24433 discussed similar crossing failures on Edinburgh.
Auchengray due to slow freights
Kirknewton due to station on departure side

Concluded that some crossing functionality is not present in the usual data collated for a sim.

Bill

Log in to reply
Crossing Failure at Whittington AHBC (Line Speeds?) 03/06/2022 at 20:15 #146707
GeoffM
Avatar
6288 posts
9pN1SEAp in post 146705 said:
Has there been an uplift in primary line speeds since the date that the sim was set?
Yes.

SimSig Boss
Log in to reply
Crossing Failure at Whittington AHBC (Line Speeds?) 03/06/2022 at 20:41 #146709
9pN1SEAp
Avatar
1102 posts
Hi,

Apologies, please disregard this. The train class had inadvertently been set to MXS=40!
Train at 60mph does not trigger de-occupancy alarm.

Thanks
Jamie

Jamie S (JAMS)
Last edited: 03/06/2022 at 20:48 by 9pN1SEAp
Reason: None given

Log in to reply