Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Who's Online

rodney30, StephenB2988, jem771, 442s3, JamesN, uboat, zefunman, Hap, kaiwhara (9 users seen recently)

Staffordshire Nuneaton 9-Day WCML Closure

You are here: Home > Forum > Simulations > Timetables > Staffordshire > Staffordshire Nuneaton 9-Day WCML Closure

Page 1 of 1

Staffordshire Nuneaton 9-Day WCML Closure 08/12/2022 at 11:58 #149191
HST125Scorton
Avatar
1136 posts
From Saturday 22nd October to Sunday 30th October 2022 engineering works are taking place between Stone/Colwich/Stafford and Rugby closing the WCML. Most services will running to amended timetables. This timetable is based on Wednesday 26th October 2022, with freight workings from the whole week expect Monday.

Notes:
6R01 is doing a fresh ballast drop between Madeley, Norton Bridge & Stafford Doxey Jn this will run at max speed of 5mph to simulate this. Also 4Q02 is preforming a running griding to and from Kidsgrove via Stoke-on-Trent this will pause for upto 30mins at Stoke-on-Trent. This service also runs at 5mph to simualte this.

Link: http://www.SimSig.co.uk/File/Details/2834

Aaron (AJRO) | Timetable Writer
Log in to reply
The following user said thank you: JamesDaniel
Staffordshire Nuneaton 9-Day WCML Closure 08/12/2022 at 17:21 #149196
bugsy
Avatar
1696 posts
HST125Scorton in post 149191 said:
From Saturday 22nd October to Sunday 30th October 2022 engineering works are taking place between Stone/Colwich/Stafford and Rugby closing the WCML. Most services will running to amended timetables. This timetable is based on Wednesday 26th October 2022, with freight workings from the whole week expect Monday.

Notes:
6R01 is doing a fresh ballast drop between Madeley, Norton Bridge & Stafford Doxey Jn this will run at max speed of 5mph to simulate this. Also 4Q02 is preforming a running griding to and from Kidsgrove via Stoke-on-Trent this will pause for upto 30mins at Stoke-on-Trent. This service also runs at 5mph to simualte this.

Link: http://www.SimSig.co.uk/File/Details/2834
Your link brings up an error 404 code

Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
Staffordshire Nuneaton 9-Day WCML Closure 08/12/2022 at 19:18 #149200
HST125Scorton
Avatar
1136 posts
bugsy in post 149196 said:
HST125Scorton in post 149191 said:
From Saturday 22nd October to Sunday 30th October 2022 engineering works are taking place between Stone/Colwich/Stafford and Rugby closing the WCML. Most services will running to amended timetables. This timetable is based on Wednesday 26th October 2022, with freight workings from the whole week expect Monday.

Notes:
6R01 is doing a fresh ballast drop between Madeley, Norton Bridge & Stafford Doxey Jn this will run at max speed of 5mph to simulate this. Also 4Q02 is preforming a running griding to and from Kidsgrove via Stoke-on-Trent this will pause for upto 30mins at Stoke-on-Trent. This service also runs at 5mph to simulate this.

Link: http://www.SimSig.co.uk/File/Details/2834
Your link brings up an error 404 code
Should be live now the link, apologies forgot to mention the link for when approved :-). Also to mention freight is from the duration of the week except MO.

Aaron (AJRO) | Timetable Writer
Last edited: 08/12/2022 at 19:21 by HST125Scorton
Reason: None given

Log in to reply
Staffordshire Nuneaton 9-Day WCML Closure 11/12/2022 at 17:03 #149228
i26
Avatar
306 posts
Evening. Loving the timetable. 1G06 - G43196 has an arrival time and departure time at Stafford for P4 but is marked to pass.

Log in to reply
The following user said thank you: HST125Scorton
Staffordshire Nuneaton 9-Day WCML Closure 14/01/2023 at 12:54 #150142
304033
Avatar
53 posts
Just finished this. Its GREAT!
Turn up the delays and you really have to be on your toes making sure the freights dont slow down the 1xxx and 2xxx's

Thank you!

Log in to reply
The following user said thank you: HST125Scorton
Staffordshire Nuneaton 9-Day WCML Closure 14/01/2023 at 13:09 #150143
HST125Scorton
Avatar
1136 posts
304033 in post 150142 said:
Just finished this. Its GREAT!
Turn up the delays and you really have to be on your toes making sure the freights dont slow down the 1xxx and 2xxx's

Thank you! :)
I'm glad you enjoy this timetable!.

Aaron (AJRO) | Timetable Writer
Log in to reply