Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Who's Online

Hope St - Peakstone Arr-Dep Length Inaccuracy

You are here: Home > Forum > Simulations > Released > Manchester North > Hope St - Peakstone Arr-Dep Length Inaccuracy

Page 1 of 1

Hope St - Peakstone Arr-Dep Length Inaccuracy 10/12/2022 at 10:50 #149219
HST125Scorton
Avatar
1136 posts
I'm curious to know why the loop on the Arr/Dep at Peakstone is only 300m in the 2017-current era? Trains from Peak Forest Cemex are well over 300m. Upon recently a Class 66 + 24 HYA-Bs come in at 379m and has been for some time. The Arr/Dep and Run Round Sdg are both 400m in length. Also while I'm here Collyhurst Street Sidings Arr/Dep road is also 280m. The manual states Peakstone Arr/Dep is 300m which is incorrect and Collyhurst Arr/Dep as 245m which is also incorrect.
Aaron (AJRO) | Timetable Writer
Last edited: 10/12/2022 at 10:54 by HST125Scorton
Reason: Minor Detailing

Log in to reply
Hope St - Peakstone Arr-Dep Length Inaccuracy 11/12/2022 at 12:03 #149223
headshot119
Avatar
4869 posts
Are you just trying to say that the manual lists the incorrect lengths? The actually sidings in sim appear to be able to cope fine with the lengths you've quoted.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Hope St - Peakstone Arr-Dep Length Inaccuracy 11/12/2022 at 12:41 #149224
HST125Scorton
Avatar
1136 posts
headshot119 in post 149223 said:
Are you just trying to say that the manual lists the incorrect lengths? The actually sidings in sim appear to be able to cope fine with the lengths you've quoted.
Yes I believe the manual is showing the incorrect lengths. As you say the sidings hold the longer trains, I did some testing with the train I mentioned at Peakstone.

Aaron (AJRO) | Timetable Writer
Log in to reply