Rugby Centre Winter 2021 train lengths

You are here: Home > Forum > Simulations > Released > Rugby > Rugby Centre Winter 2021 train lengths

Page 1 of 1

Rugby Centre Winter 2021 train lengths 14/03/2024 at 17:24 #155700
BenWright
Avatar
142 posts
Online
I couldn't find the thread for this timetable so I've made a new one. The trains 5Y10 and 1Y10 are both formed as 2 class 350's and they want to join each other, as such this makes a 16 carriage train and it's too long to fit into the platforms at NMP resulting in an overlap. I think one of these is meant to be a 4 car and I've had to reduce the length on 5Y10 to 82m instead of 164m.
Log in to reply
Rugby Centre Winter 2021 train lengths 14/03/2024 at 21:41 #155702
HST125Scorton
Avatar
1138 posts
Online
5Y10 indeed should be Class 350 [4 Car]. Now sorted in the timetable. 1Y10 should be 2x 350 [8-Car] with 5Y10 been attached to make it 3x 350 [12-Car] for Peak.
Aaron (AJRO) | Timetable Writer
Log in to reply
The following user said thank you: BenWright