Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Warrington 1977 & 1996 timetables

You are here: Home > Forum > Simulations > Timetables > Warrington PSB > Warrington 1977 & 1996 timetables

Page 2 of 2

Warrington 1977 & 1996 timetables 04/07/2022 at 17:05 #147140
Ray
Avatar
211 posts
Many thx to everyone. I finally got the loco to join. I think I overlooked the trap points and didnt lock them closed. THe loco and the train did a Hokey Koky dance for some time before they finally decided to join.
Log in to reply
Warrington 1977 & 1996 timetables 05/07/2022 at 00:58 #147144
Phil-jmw
Avatar
675 posts
whatlep in post 147138 said:
I also need to double-check if it affects the workings that change locos at Bank Quay. I don't recall that being an issue and you should have already notied an issue with 6S99-0956 by now. Please let me know if you see an issue with any loco changes.
I have just completed the 6S99 loco change on the base timetable without any issues.

Log in to reply
The following user said thank you: whatlep
Warrington 1977 & 1996 timetables 05/07/2022 at 07:39 #147145
AlexH
Avatar
161 posts
Really enjoying these timetables, thanks.

On the 'through line stop' topic, there's a few missing from the 1996 timetable as well. I don't have reporting codes to hand, sorry, but it's those booked crew change on the GL/SL at Warrington.

Log in to reply
Warrington 1977 & 1996 timetables 05/07/2022 at 10:08 #147149
whatlep
Avatar
377 posts
AlexH in post 147145 said:
Really enjoying these timetables, thanks.

On the 'through line stop' topic, there's a few missing from the 1996 timetable as well. I don't have reporting codes to hand, sorry, but it's those booked crew change on the GL/SL at Warrington.
Thank you, both for the kind words and the alert. I think there are six trains affected:
6E95-0204 (00.00 timetable only)
7M62MX-0521
6F69-0914
6E64-0952
6V23MWFO-1755
6E97-2217

The work-around is the same as 1977. Add a tick for each train to the "through lne stop" box at Warrington BQ. A new version 1.2 will be issued in due course adding the fixes.

Log in to reply
Warrington 1977 & 1996 timetables 05/07/2022 at 17:28 #147160
whatlep
Avatar
377 posts
Two additional "nits" noticed in testing the 1977 timetable today.

There is a note in the timetable "issues" section stating that trains into Dallam (steel) terminal have to reverse at Warrington Bank Quay. That was true when this timetable was written, but updates to the simulation now allow trains to reverse at WN173 (wrong direction signal by the "Dallam Sidings" label), which is close enough to being the ground frame present in 1977. This is purely a text change - the trains perform as desired right from the base timetable version.

On Mondays only, the DPU that forms 5J28MO-0430/4J28MO-0500 needs to use bay platform 3 at Wigan rather than 2. There should be ample room in platform 2, but the simulation software thinks otherwise.

Both to be included in V1.2 fixes.

Log in to reply
The following users said thank you: bossman, norman B
Warrington 1977 & 1996 timetables 01/08/2022 at 16:11 #147426
whatlep
Avatar
377 posts
V1.2 timetables are now available for the 1977 timetable and both 1996 versions. In each case, all bugs identified so far in this thread have been fixed.

Thanks for your help identifying issues, kind words and patience!

The attached picture looking south from Winwick Jn in August 1979 is a bijou bonus!


Post has attachments. Log in to view them.
Log in to reply
Warrington 1977 & 1996 timetables 01/08/2022 at 16:34 #147427
Splodge
Avatar
716 posts
One question I have - what period was the Newton-le-Willows Motorail terminal operational? Considering it was wired when the WCML was I thought it would have seen use in this TT
There's the right way, the wrong way and the railway.
Log in to reply
Warrington 1977 & 1996 timetables 01/08/2022 at 17:33 #147428
Soton_Speed
Avatar
285 posts
Splodge in post 147427 said:
One question I have - what period was the Newton-le-Willows Motorail terminal operational? Considering it was wired when the WCML was I thought it would have seen use in this TT
According to this link , 1966(?) to 1973 when the traffic was moved to Crewe.

In Zone 6, no one can hear you scream...
Log in to reply
The following user said thank you: Splodge
Warrington 1977 & 1996 timetables 20/09/2022 at 10:43 #148081
Splodge
Avatar
716 posts
7P08MX-0631 is booked to enter at 0631, but has a rule meaning it must wait until 45 minutes after 7P48-1645 leaves the area - 7P48 as the ID suggests doesn't even enter until 1645, leaving at 1649 so 7P08 enters almost 12 late. The crew waiting at Wigan must be fuming!
There's the right way, the wrong way and the railway.
Log in to reply
The following user said thank you: whatlep
Warrington 1977 & 1996 timetables 23/09/2022 at 12:03 #148101
whatlep
Avatar
377 posts
Splodge in post 148081 said:
7P08MX-0631 is booked to enter at 0631, but has a rule meaning it must wait until 45 minutes after 7P48-1645 leaves the area - 7P48 as the ID suggests doesn't even enter until 1645, leaving at 1649 so 7P08 enters almost 12 late. The crew waiting at Wigan must be fuming!
Many thanks for this report regarding the 1977 timetable. The rule for 7P08 is an error, as I'm sure you've guessed (duplicating the correct one for 7P48). Feel free to delete it, as I'll do in an updated version at some point.

Log in to reply
Warrington 1977 & 1996 timetables 14/11/2022 at 20:01 #148740
Andy174
Avatar
94 posts
Bickershaw colliery called up asking for permission for 9H27 to enter but it hasn't appeared, 0H27 had been sent and arrived but I did notice that after it had done so I re-set the single line to clear, should it have been left showing occupied in order for 9H27 to appear?
Log in to reply
Warrington 1977 & 1996 timetables 14/11/2022 at 20:13 #148742
headshot119
Avatar
4869 posts
Trains will only enter from Bickershaw with the branch occupied, if you've reset it to clear the train won't enter.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
The following users said thank you: Andy174, whatlep
Warrington 1977 & 1996 timetables 14/11/2022 at 20:15 #148743
Andy174
Avatar
94 posts
headshot119 in post 148742 said:
Trains will only enter from Bickershaw with the branch occupied, if you've reset it to clear the train won't enter.

Cheers, operator error!

Log in to reply