|
- trains not showing up
-
Started by
Ramond
-
08/01/2019 at 03:13
-
Have you made sure that you've selected the timetable before starting the simula...
|
|
|
|
- trains not showing up
-
Started by
Ramond
-
08/01/2019 at 03:13
-
sure, it didn't all the simulations and timetables. I tried it with the Aston an...
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
OK I'll give it a whirl and report back.
Cheers
Neil
|
|
|
|
|
|
|
|
- East London Line
-
Started by
DaveHarries
-
12/01/2019 at 18:38
-
King's Cross? It fringes to Upminster IECC NLL East Workstation at Highbury and ...
|
|
|
|
- East London Line
-
Started by
DaveHarries
-
12/01/2019 at 18:38
-
Thank you both for your replies. Would possibly make quite a good forum. Would a...
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
[quote=nnr;post=114691]Savegame attached. Details in 114672
Thanks Neil[/quot...
|
|
|
|
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
Savegame attached. Details in 114672
Thanks Neil
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
[quote=nnr;post=114688]Pic attached showing down train sitting at station throat...
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
Manually signalled in, ACI working fine in P1
[attachment=10043]2019-01-12 (1)....
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
Pic attached showing down train sitting at station throat with train in P2
The ...
|
|
|
|
- East London Line
-
Started by
DaveHarries
-
12/01/2019 at 18:38
-
There's a few photos of the SCC from a telecoms engineer who worked on the commi...
|
|
|
|
- East London Line
-
Started by
DaveHarries
-
12/01/2019 at 18:38
-
Its controlled by the new Cross signal control centre to Highbury and Islington....
|
|
|
|
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
Paisley May 2015 (04.45 start) v1
I'll see what happens now it has been modi...
|
|
|
|
|
|
|
|
|
|
|
|
- East London Line
-
Started by
DaveHarries
-
12/01/2019 at 18:38
-
Evening all,
Looking on London Bridge ASC sim I notice that at least two of t...
|
|
|
|
- North London Line
-
Started by
ajax103
-
12/01/2019 at 16:47
-
The North London Line on the loader was an accidental release from a long time a...
|
|
|
|
- North London Line
-
Started by
ajax103
-
12/01/2019 at 16:47
-
I've recently had fun updating my licences from one laptop to another and when I...
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
[quote=Peter Bennet;post=114677]I can't reproduce any problems other than the AC...
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
I can't reproduce any problems other than the ACI.
Peter
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
[quote=Peter Bennet;post=114675]I don't understand this report.
There is an ACI...
|
|
|
|
- Ayr Platform 2
-
Started by
nnr
-
11/01/2019 at 15:46
-
I don't understand this report.
There is an ACI issue which I've fixed.
Pete...
|
|
|