Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Gloucester platform lengths

You are here: Home > Forum > Simulations > Released > Gloucester > Gloucester platform lengths

Page 1 of 1

Gloucester platform lengths 28/09/2011 at 14:57 #21380
Adrian the Rock
Avatar
111 posts
I have been playing Gloucester v2.201 with the 1989 V2.0 amended TT, and have been surprised to have 220m trains (eg a typical 8+2 HST formation) refusing to fit into P2 between G58 and G133 signals. If I run a train of this length in from the Horton Rd end, its rear when stopped remains foul of the crossover between the DM and UM, even when set to stop at the Far End Exact.

Is this prototypical? My Quail atlas gives 12 20m coachlengths (each) for both P1 and P2 at Gloucester, which suggests P2 should be able to accommodate an 8+2 HST with comfort without it overhanging the signals.

Last edited: 28/09/2011 at 14:58 by Adrian the Rock
Reason: typos

Log in to reply
Re: Gloucester platform lengths 28/09/2011 at 15:13 #21381
headshot119
Avatar
4869 posts
No it isn't.

Having visited Gloucester I've seen a 2+8 HST berthed in 2 well clear of both signals.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
The following user said thank you: Adrian the Rock
Re: Gloucester platform lengths 28/09/2011 at 15:24 #21382
GeoffM
Avatar
6280 posts
Online
By the looks of it, the sim has it measured from the west gantry to the signal at the east end which is indeed about 200m. But the west end signal is on the platform, not on the gantry, and makes the platform about 45m longer. Conveniently there is an HST sitting in the platform on Google Earth showing that it fits with nearly a carriage length to spare.
SimSig Boss
Log in to reply
The following user said thank you: Adrian the Rock