1980 Grimsby Town

You are here: Home > Forum > Simulations > Released > South Humberside > 1980 Grimsby Town

Page 1 of 1

1980 Grimsby Town 01/06/2011 at 14:12 #3130
BarryM
Avatar
2158 posts
One for Chris. In the 1980s layout the TD at signal P975 Grimsby Town Up Accept is left behind when a train moves to P3 signal P980.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 01/06/2011 at 14:12 #16230
BarryM
Avatar
2158 posts
One for Chris. In the 1980s layout the TD at signal P975 Grimsby Town Up Accept is left behind when a train moves to P3 signal P980.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 02/06/2011 at 01:35 #16249
Lardybiker
Avatar
771 posts
I have added a bug for this
Log in to reply
1980 Grimsby Town 05/06/2011 at 10:23 #16325
BarryM
Avatar
2158 posts
Found another bug at Grimsby Town (1980) Chris. Giving a train the road on the up from platform 3, signal P980 will clear without the LC barriers down.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 08/06/2011 at 06:23 #16410
BarryM
Avatar
2158 posts
Another 1980's Chris.
Wellowgate LC will not raise after a train arrives at platform 2 on the Up direction.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 08/06/2011 at 07:17 #16412
BarryM
Avatar
2158 posts
BarryM said:
Another 1980's Chris.
Wellowgate LC will not raise after a train arrives at platform 2 on the Up direction.

I did not have this problem earlier. It may be related to the Internal Error reported earlier.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 10/06/2011 at 06:10 #16458
lazlo52
Avatar
69 posts
Another two for the 1980 timetable.
1) Ulceby platform is too small for a shunt loco to stand between the signals.
2) Platform 2 at Cleethorpes is too small for a class 47 loco to run round

Log in to reply
1980 Grimsby Town 10/06/2011 at 09:48 #16461
58050
Avatar
2650 posts
Online
Lazlo52, the 2 points you have raised are in respect of my 1997-1998 timetable I presume. That said the first point is that the train length needs altering so that the Immingham Pilot trip can be accomodated in the platform at Ulceby & then go forward towards New Holland grain terminal. The second point regarding the run round of the Cl.47 off 1Z06 in Cleethorpes station. This issue was never raised when the timetable was tested online. However I wonder whether the stopping point of 1Z06 needs altering so that the run round can take place. I'll look into that & speak to some of those who were testing online. Will post the reults when I have found a solution, unless anyone knows one already.
Log in to reply
1980 Grimsby Town 10/06/2011 at 14:36 #16465
jc92
Avatar
3630 posts
re: 1z06. has its stopping point been set as NX? the train has to stop short of the track circuit fouling the pointwork or else it will remain occupied and appear as though the loco is too long

the main issue however is that the 47 needs to move from platform 2 to platform 2 in terms of timetable points. not sure if this is possible

havent yet been able to test this working

EDIT:
have now tested 1z06 and 0z06. if the stopping point is entered as NX+19 then the train will stop short of the fouling TC and leave sufficient room for the loco to run back onto the train

however it does require 0z06 to abandon tt in order for it to stop at cleethorpes buffer stops. otherwise it just sits in the platform and appears to be to long. it isnt however and will fit in the headshunt. however the route for 1z06 (p998 - cleethorpes buffer stops) will not release and so the HS points cannot be moved. in other words, the train will fit but the sim wont allow a run round.

hope this helps 58050

"We don't stop camborne wednesdays"
Log in to reply
1980 Grimsby Town 11/06/2011 at 01:12 #16469
BarryM
Avatar
2158 posts
Additional locations need to be entered in the timetable.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 11/06/2011 at 01:32 #16470
BarryM
Avatar
2158 posts
BarryM said:
One for Chris. In the 1980s layout the TD at signal P975 Grimsby Town Up Accept is left behind when a train moves to P3 signal P980.

Correction: P975 should read P974.
Another one! Trains entering via the loop from Marsh Nth Junction to Grimsby Town loose their TD at P974 but it appears at P976 without the road being set.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
1980 Grimsby Town 11/06/2011 at 01:48 #16471
AndyG
Avatar
1835 posts
It's possible to RR a 20m loco off 158m train (total length 178m) with the train booked into P2 with FX+75 stop;
Problems are that the sim is not fully set up for the RR move, so for now you have to do the following:
1) incoming train needs to be spad past P998 and P96 into the platform (we need to NOT set route, as it won't drop from the 92m TC over the points later);
2) once 0Zxx has detached front, it needs TT abandon, reversed to up (to move it up to 30m TC at buffers);
3) reverse 0Zxx to down & reinstate TT.

The loco TT would need these locations: Plt2 - P97(rev) {new location} - Plt1 - P96(rev) - Plt2, and also a shortened route into P2 for the initial train arrival. I've put this as a wish list item for Chris to see if it can be incorporated into the sim.

I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either.
Log in to reply
1980 Grimsby Town 14/06/2011 at 04:33 #16552
Lardybiker
Avatar
771 posts
Fixed the berth stepping into P3.
Fixed the berth step when using the Marsh Jn loop

Log in to reply