Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Minor issues

You are here: Home > Forum > Simulations > Released > Motherwell > Minor issues

Page 1 of 1

Minor issues 27/02/2014 at 13:47 #56295
NorthSig
Avatar
27 posts
A few minor issues so far:

- Cove LC (CCTV in 2000s era) behaves like an AHB.
Using no timetable, press Lower button, crossing lowers. The Crossing clear button flashes momentarily, then all barriers immediately rise. Disabling the 'Auto' [raise] button has no effect. The presence or absence of routes from MC860 or MC861 does not alter that behaviour. The crossing auto-lowers irrespective of the state of MC860 or MC861 signals, when specific approach TCs become occupied. If the signaller wanted to keep the barriers raised for some reason, it's not possible with this implementation.

- Up main south of Cove should show TC indications up to Carlisle's first signal.

- A couple of spelling errors in the lever frames list, 'Abington' is spelt incorrectly on all four occasions, also there are two apostrophes in the Findlay's siding entry.

- Kirtlebridge GF. Can be released on the panel but it's not possible to pull lever 1 on the GF, even after waiting for more than 4 minutes for a possible timeout.

Log in to reply