Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Signals 153, 224, 238 and B N St.

You are here: Home > Forum > Simulations > Released > Birmingham New Street > Signals 153, 224, 238 and B N St.

Page 1 of 1

Signals 153, 224, 238 and B N St. 14/04/2014 at 02:20 #58853
DaveBarraza
Avatar
88 posts
Are these signals the setup where they are placed right at the crossing point of the double slip, governing for all possible paths?

That's one of my "favorite tricks!"

Log in to reply
Signals 153, 224, 238 and B N St. 14/04/2014 at 15:24 #58873
GeoffM
Avatar
6282 posts
Online
They apply to both approach tracks, yes. IIRC they are physically located in the narrowest part of the double slip.
SimSig Boss
Log in to reply
Signals 153, 224, 238 and B N St. 14/04/2014 at 15:47 #58877
DaveBarraza
Avatar
88 posts
That's the way the ones at NY Penn are. They kept them in the same arrangement when they re-signalled in the 90's. Those don't have Insulated Joints due to the location, so there are some design considerations.

Thanks!

Log in to reply