Simulation and Timetable Release Schedule 10/03/2018 at 15:59 #106602
58050
Avatar
2196 posts
Online
I'd certainly go for that, an earlier era would be far better than today not only for the variety of traffic, but also for regulating purposes. Back in the 1970s the MGR trains bound for Fiddlers Ferry were worked by pairs of Cl.76 locos to Guide Bridge & then replaced by a single Cl.47 which would then take the route from Stockport Jn over the single line to Heaton Norris Jn, thread it's way across the viaduct, through Stockport station & then diverge onto the line at Edgeley Jn No.2 towards Northenden Jn. Also the change from diesel - electric - diesel on the York - Shrewsbury - Yorkmail during the early hours would also create someting different from the modern era.
Even in the mid - late 1980s the binliner would run round on the through lines at Stockport station. I've got photos of 45046 doing the very thing taken back in 1985-1986 IIRC. I've got the stuff I need to do a 1987 timetable for both the Manchester South sim & Manchester Piccadilly if the sims can handle that? This would chain with the Peak District 1987 timetable I wrote for that sim as & when the chaining for those sims gets sorted.
The only thing that I've noticed that is wrong with Manchester South is the position on the panel of Heaton Norris Jn signalbox, unless it was plaved where it is due to the lack of room where it actually is between the Down & Up lines. I managed to get some photos of it whilst passing it on a train back in the 1990s.

Log in to reply
The following user said thank you: bossman
Simulation and Timetable Release Schedule 10/03/2018 at 16:00 #106603
Steamer
Avatar
2713 posts
Online
whatlep in post 106467 said:
Very interesting. Thank you. One small item I noticed on the Hereford Screenshot. It's Onibury, not Oninbury.
Also, Pontypool has an island platform.

Let the challenge... Begin!
Log in to reply
Simulation and Timetable Release Schedule 10/03/2018 at 16:04 #106604
jc92
Avatar
2273 posts
Online
Heaton norris sits between the pairs of up and down lines but its marked with a *1 to show thats where its located
Log in to reply
The following user said thank you: 58050
Simulation and Timetable Release Schedule 10/03/2018 at 18:20 #106615
pedroathome
Avatar
379 posts
Boxes were added in quickly before the meet, to indicate their positioning for clearing points. At the time, I couldn't, in my head see how to shrink them down size wise. (Thanks Ben....)

The *1 was to indicate where Heaton Norris is located between the running lines for the up and down fast.

For anyone interest, I have updated the Stockport preview image, link in the initial post on this thread, to the current state.

As for an older era, if someone has the data and is willing to share that with me, I will happily add in an older era. For example, in addition to that mentioned up the thread, I know there was more sidings around Edgeley Junction No.2.

James

Log in to reply
The following user said thank you: Steamer
Simulation and Timetable Release Schedule 10/03/2018 at 23:37 #106633
Steamer
Avatar
2713 posts
Online
Will there be a multiplayer/masochist option to run the simulation with Hunts Cross style lever frames?
Let the challenge... Begin!
Log in to reply
The following user said thank you: Ar88
Simulation and Timetable Release Schedule 10/03/2018 at 23:43 #106634
Ar88
Avatar
257 posts
Online
Steamer in post 106633 said:
Will there be a multiplayer/masochist option to run the simulation with Hunts Cross style lever frames?
Will there also be a little "Operating Instructions" paper for the "box" and box cat?

The Welsh contingent. Aron, or Ar to mates. Also known as 88E or ThatManCalledAr.
Log in to reply
Simulation and Timetable Release Schedule 11/03/2018 at 05:04 #106638
whatlep
Avatar
131 posts
Ar88 in post 106634 said:
Steamer in post 106633 said:
Will there be a multiplayer/masochist option to run the simulation with Hunts Cross style lever frames?
Will there also be a little "Operating Instructions" paper for the "box" and box cat?
If you really wanted to up the stress level, force correct use of the special bell codes used in the Stockport area for routing purposes (he wrote, grinning sadistically).

Meanwhile, attached are two photos of the former Stockport No. 2 diagram, as preserved by the group who run live steam locos in Walton Park, Sale.




Post has attachments. Log in to view them.
Log in to reply
The following user said thank you: 58050
Simulation and Timetable Release Schedule 11/03/2018 at 07:54 #106639
Giantray
Avatar
165 posts
I will be looking forward to the Port Talbot sim. Do not know the area, but looks very interesting. I had a little trouble following the lines. Took me quite a while to find where Bridgend line to Maesteg married up on the diagram, realising the confusing was because the Tondu diagram does not follow the same direction of flow as that from Bridgend. So as a bit of fun I did a version I would have preferred.
[attachment=9394]Original Tondu.jpg[/attachment]

[attachment=9395]alternative Tondu.jpg[/attachment]

Post has attachments. Log in to view them.
Log in to reply
Simulation and Timetable Release Schedule 11/03/2018 at 15:42 #106649
Ar88
Avatar
257 posts
Online
Giantray in post 106639 said:
I will be looking forward to the Port Talbot sim. Do not know the area, but looks very interesting. I had a little trouble following the lines. Took me quite a while to find where Bridgend line to Maesteg married up on the diagram, realising the confusing was because the Tondu diagram does not follow the same direction of flow as that from Bridgend. So as a bit of fun I did a version I would have preferred.
[attachment=9394]Original Tondu.jpg[/attachment]

[attachment=9395]alternative Tondu.jpg[/attachment]
It certainly looks like it will be a highly enjoyable sim - will be able to appreciate it more after yesterday's railtour!

Tondu is an interesting area....the signalling has been retained as semaphore PURELY for TATA Steel....2 ways in & (effectively) 1 way out -
Bridgend & Margam Moors Jn (freight diversionary line which is used maybe once a year....)
Tondu-Maesteg for passenger,
Tondu - Garw Loop for freight turn-around...that line used to continue up to Pontycymmer.

I've got internal photos of the box if you would be interested to see the diagram.

The Welsh contingent. Aron, or Ar to mates. Also known as 88E or ThatManCalledAr.
Log in to reply
Simulation and Timetable Release Schedule 11/03/2018 at 15:53 #106650
Ar88
Avatar
257 posts
Online
Giantray in post 106639 said:
I will be looking forward to the Port Talbot sim. Do not know the area, but looks very interesting. I had a little trouble following the lines. Took me quite a while to find where Bridgend line to Maesteg married up on the diagram, realising the confusing was because the Tondu diagram does not follow the same direction of flow as that from Bridgend. So as a bit of fun I did a version I would have preferred.
[attachment=9394]Original Tondu.jpg[/attachment]

[attachment=9395]alternative Tondu.jpg[/attachment]
ALSO: Setting it out like you have makes no sense - the Garw/Margam lines are opposite ends of eachother, so you basically traverse across the FULL Tondu area to go from 1 to the other.

The Welsh contingent. Aron, or Ar to mates. Also known as 88E or ThatManCalledAr.
Log in to reply
Simulation and Timetable Release Schedule 11/03/2018 at 15:56 #106651
Ar88
Avatar
257 posts
Online
As the diagram shows - the Garw loop is on the same end as the Maesteg line, with the Margam/Bridgend lines going off on a Y!

Post has attachments. Log in to view them.
The Welsh contingent. Aron, or Ar to mates. Also known as 88E or ThatManCalledAr.
Last edited: 11/03/2018 at 15:57 by Ar88
Reason: Text

Log in to reply
The following user said thank you: DaveHarries
Simulation and Timetable Release Schedule 11/03/2018 at 18:56 #106661
headshot119
Avatar
2683 posts
Giantray in post 106639 said:
I will be looking forward to the Port Talbot sim. Do not know the area, but looks very interesting. I had a little trouble following the lines. Took me quite a while to find where Bridgend line to Maesteg married up on the diagram, realising the confusing was because the Tondu diagram does not follow the same direction of flow as that from Bridgend. So as a bit of fun I did a version I would have preferred.
[attachment=9394]Original Tondu.jpg[/attachment]

[attachment=9395]alternative Tondu.jpg[/attachment]
You'd have to address your concern to the original builder of the box, shamelessly I just copied it.

"Platform 1 your Maesteg service. Platform 1A your Aberdare. Platform 2 your London!"
Log in to reply
The following user said thank you: Ar88
Simulation and Timetable Release Schedule 31/03/2018 at 21:06 #107151
headshot119
Avatar
2683 posts
Well folks with the release of the 2015 timetable for LTS, and the release of Manchester East yesterday that draws the planned Q1 releases for 2018 to a close.

Here's to Q2!

"Platform 1 your Maesteg service. Platform 1A your Aberdare. Platform 2 your London!"
Log in to reply
The following users said thank you: HST125Scorton, JamesN, Phil-jmw, Hap, Philo, bri2808, norman B, Steamer
Simulation and Timetable Release Schedule 03/04/2018 at 17:47 #107253
whatlep
Avatar
131 posts
Purely for general information and to avoid any conflicts with other timetable devleopers, I am working on additional timetables as follows:

Manchester East 1985 (pre Hazel Grove chord; long distance passenger workings via Philips Park - Ashburys)
Manchester East 1987 (chord open: many cross-Manchester workings via Ashton Moss)
Manchester East 1991 (after shift of North Trans-Pennine to Piccadilly)

Manchester Piccadilly 1996 (both airport chords open; 2 platforms)
also possibly Manchester Piccadilly 1993 (early days of airport; only north chord open)

These are all subject to the moderators' OK, as with all user-contributed timetables, so no guarantees on availability or timescales. That said, the Manchester East trio should be complete within a month.

The Piccadilly ones are a massive undertaking and testing takes ages, so they will be end-May at the earliest. 1993 will only be produced if there is enough differentiation to 1996 to get me interested!

Log in to reply
The following users said thank you: Phil-jmw, boysha
Simulation and Timetable Release Schedule 28/06/2018 at 21:07 #109967
hotwellian
Avatar
109 posts
West Wales. It is Llanboidy, not Llanboldy, between Whitland and Clunderwen
Log in to reply
Simulation and Timetable Release Schedule 28/06/2018 at 21:45 #109969
Meld
Avatar
410 posts
headshot119 in post 106438 said:
Simulation and Timetable Release Schedule

First off, a note of caution, this only applies to simulations in development by Headshot119 (Karl) and Pedroathome (James), and timetables in development by Meld (John), Kaiwhara (Andrew) and MarkC (Mark). Other things may be released by other developers above and beyond what is planned here. All timetable releases referenced are from the 8th of April 2015 set. Any simulation released is assumed to ship with an 8th of April 2015 timetable.

I will keep on top of this post, and add any updates, changes etc as we go along.

Release Schedule

Quarter 2

Timetable – Marylebone – Late Q2 (Meld)
Timetable – Oxford – Late Q2 (Meld)
Timetable – Leamington – Late Q2 (Meld)
These hopefully will still make the end of Q2 but may now be early Q3

Then for the end of Q3 Newcastle, York, Leeds Ardsley, Leeds East/West & Leeds North

These additions to the schedule are subject to any new simulations developed by the Dev Team

Last edited: 28/06/2018 at 22:04 by Meld
Reason: None given

Log in to reply
Simulation and Timetable Release Schedule 29/06/2018 at 13:08 #109971
JohnMiller
Avatar
286 posts
just to say we Rotherwood & Wath men worked the 1970s MGR trains bound for Fiddlers Ferry with pairs of Cl.76s to Mottram Yard or Godley Jc but never to Guide Bridge.
Log in to reply
Simulation and Timetable Release Schedule 14/07/2018 at 15:42 #110240
Shaun
Avatar
6 posts
Are the Port Talbot, West Wales and Hereford sims still planned for release mid Q3?
Log in to reply
Simulation and Timetable Release Schedule 15/07/2018 at 16:29 #110254
headshot119
Avatar
2683 posts
Shaun in post 110240 said:
Are the Port Talbot, West Wales and Hereford sims still planned for release mid Q3?
Shaun, that's still the plan at the current moment in time, if anything changes I'll keep this thread up to date.

"Platform 1 your Maesteg service. Platform 1A your Aberdare. Platform 2 your London!"