Upcoming Games

London Bridge ASC 22/05/2018 22:00:00 - Andrew G

Add a game

Upcoming Events

Help with division - Timetable building

You are here: Home > Forum > General > General questions, comments, and issues > Help with division - Timetable building

Page 1 of 1

[Solved] Help with division - Timetable building 16/05/2018 at 00:49 #107970
rfw
Avatar
42 posts
So I'm working on my project-x timetable for Oxted, and I am having a dividing problem with train 5X39...

.

5X39 is 846m long, when it detaches the front at Ashurst to form 5E12 something happens that means 5E12 becomes 846m long, 5E16 becomes 282m long then simsig realises something doesn't add up flags this error:

then 5X39 vanishes from existence before 2E19 has a chance to come into existence

The messages window shows the error happens on completion of the second divide (DF: 5E16) / (N: 2E19).
But the problem stems from the first divide (DF:5E12), where it takes the original 846m and splits it into one of 846m and another of 8m.
On the second divide (DF: 5E16) it takes an 8m train and divides it into an 846m one and an 8m one

Run on Loader version 4.6.9 & Oxted data version 3.0

EDIT: for some reason the second screenshot shows the correct length for 5E16, no idea as to why.

Last edited: 16/05/2018 at 01:07 by rfw
Reason: None given

Log in to reply
[Solved] Help with division - Timetable building 16/05/2018 at 01:06 #107971
rfw
Avatar
42 posts
Problem solved. I'm an idiot.

It was a PICNIC error...

I forgot to set the train type of 5E12 & 5E16 in the editor to be a a 12 car 171 before the split happened, meaning it magiced up some train length and then when the new train was 274m longer than the old one SimSig only then intervened and questioned what was going on


I feel stupid now. Stupid boy.

Last edited: 16/05/2018 at 01:09 by rfw
Reason: None given

Log in to reply
Help with division - Timetable building 16/05/2018 at 07:58 #107973
Peter Bennet
Avatar
4345 posts
PICNIC?

Peter

Stereotypes only have themselves to blame
Log in to reply
Help with division - Timetable building 16/05/2018 at 08:10 #107974
headshot119
Avatar
2635 posts
Online
Problem In Chair Not In Computer.
"Platform 1 your Maesteg service. Platform 1A your Aberdare. Platform 2 your London!"
Log in to reply