Some observations and questions around London Bridge 07/07/2018 at 15:17 #110107
Jan
Avatar
595 posts
GeoffM in post 110100 said:
Jan in post 110099 said:
Not sure if this save is already too late or not, but it shows ARS attempting to set a wrong route for 5V62 if you remove the reminder on signal 271.
It is helpful to see it but it is too late unfortunately. The data shows it trying to route up to signal 271 but not how it got into that state. If you make that train ARS again it correctly routes to 361. So something must have happened earlier to it.

I tried an earlier snapshot from 07:30, when 5V62 hadn't even been formed yet from its inbound service (2A12), but unfortunately this didn't reproduce the situation.

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
Some observations and questions around London Bridge 10/07/2018 at 07:43 #110180
Jan
Avatar
595 posts
I wonder whether this problem predominantly happens after reloading a saved sim?
For example yesterday during the original playthrough, where the sim had been runnning continuously for several hours sim time, nothing strange happened. After reloading from a snapshot however, ARS proceeded to set a wrong route and after cancelling it, I got a message that a train that had already terminated at London Bridge had been made non-ARS because of the cancelled route.

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
The following user said thank you: bri2808
Some observations and questions around London Bridge 10/07/2018 at 19:53 #110187
Jan
Avatar
595 posts
E.g. if you load the attached snapshot and let the sim run for a minute or two, once 2N38 departs South Bermondsey ARS sets a wrong route for it from the Up South London to the Up Main. If you cancel that route again, the TD for 5J73 (which at the start of the saved sim has already terminated and formed 2J73) in platform 12 at London Bridge is then made non-ARS.
Post has attachments. Log in to view them.
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
Some observations and questions around London Bridge 13/07/2018 at 11:02 #110222
lawrm
Avatar
29 posts
How can I run the updated TT on a continuing sim? Surely I have to go back and start again.
Log in to reply
Some observations and questions around London Bridge 13/07/2018 at 11:42 #110224
postal
Avatar
3457 posts
lawrm in post 110222 said:
How can I run the updated TT on a continuing sim? Surely I have to go back and start again.
Correct. However the updated TT won't fix your issue with ARS at Parks Bridge Jn as that is a sim problem not a TT problem.

"The most costly of all follies is to believe passionately in the palpably not true. It is the chief occupation of mankind." - H. L. Mencken (12 September 1880 – 29 January 1956), American journalist.