Question on timetable for 3MB7 and ST22

You are here: Home > Forum > Simulations > Australian Sims > Moss Vale NSW > Question on timetable for 3MB7 and ST22

Page 1 of 1

Question on timetable for 3MB7 and ST22 29/07/2018 at 20:59 #110534
Muzer
Avatar
718 posts
I've noticed that the timetable for 3MB7 appears to have it "looped" at Harden, for passenger train ST22 to pass, since the former has a half-hour wait there, during which the latter is booked to stop at Harden. However, the goods loop at Harden is much too short for 3MB7 to fit. In the event the freight train is particularly early so I'm hoping it'll reach the next loopable point by the time the passenger catches up, but I'm wondering what the intention with the timetable is here? Was the loop perhaps lengthened at some point, or is the train maybe shorter in real life than in the timetable?
Last edited: 29/07/2018 at 20:59 by Muzer
Reason: None given

Log in to reply
Question on timetable for 3MB7 and ST22 29/07/2018 at 21:10 #110536
Jan
Avatar
889 posts
Another possibility might be using the bi-directional stretch of Down line for overtaking, since that's approximately 3.1 km long. But in that case the timetable of 3MB7 still needs to be adjusted so that this manoeuvre works in Simsig as well.
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
Question on timetable for 3MB7 and ST22 29/07/2018 at 21:14 #110538
Muzer
Avatar
718 posts
That makes a lot of sense!
Log in to reply
Question on timetable for 3MB7 and ST22 30/07/2018 at 11:34 #110556
Nazarail
Avatar
6 posts
As Jan said I used the Down main as the passing loop, This maybe what happens in real life. I'm sure someone here can set us straight on this.
The Right way, The Wrong way and the Railway
Log in to reply
Question on timetable for 3MB7 and ST22 30/07/2018 at 14:33 #110563
Mattyq
Avatar
259 posts
Nazarail in post 110556 said:
As Jan said I used the Down main as the passing loop, This maybe what happens in real life. I'm sure someone here can set us straight on this.
This is correct. The timetable will be corrected in the next update.

Not fat ..... fluffy!! (G Iglesias)
Log in to reply
The following user said thank you: Nazarail
Question on timetable for 3MB7 and ST22 30/07/2018 at 21:50 #110596
Sparky
Avatar
84 posts
A lot of the passes that happen in this sim are meant to occur on the mainline. i.e 3MB& sits on the up main while ST22 passes on the down. Another location this happens a lot in reality is Yass. The platform on the Dn main is the only platform used for passenger services both Up & Dn so if they need to pass another service it will sit on the up whilst the pass run passed on the down.
I intend to live forever. So far so good
Log in to reply