Engineering possession/Sea Wall closures finished notifications 01/01/2019 at 10:52 #114506
axmh
Avatar
61 posts
Just been playing the Exeter sim with Sea Wall flooding closure.

How do i get the Engineering Possessions and/or Sea Wall closure notifications that the job is done and lines is open.

That question also applies to other sims with engineering works.

One could re edit the wtt for trains via edit train t/t thus notifying drivers of amended workings.

The thing is, you get engineering works at locations that gives you time saying the lines would be open at a time, mostly mornings and also notifications that engineering works is over running late in real life...... So can that be replicated in SimSig sims ?

Log in to reply
Engineering possession/Sea Wall closures finished notifications 01/01/2019 at 11:06 #114507
Steamer
Avatar
3920 posts
There are only a handful of simulations that have possessions which are lifted during the day- I think it's just Edge Hill and Oxted, both of which are intended for use with the 15/10/2009 timetable. All other possessions are in force for the entire day.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: axmh
Engineering possession/Sea Wall closures finished notifications 02/01/2019 at 12:53 #114530
Chromatix
Avatar
190 posts
This does seem like something that could reasonably be exposed for user customisation - along with other "scenario" type tweaks like leaf-fall and difficulty presets. At the moment, for example, you can't combine leaf-fall with line closures just by selecting a scenario.
Log in to reply
Engineering possession/Sea Wall closures finished notifications 02/01/2019 at 13:46 #114531
Edgemaster
Avatar
332 posts
Possessions can be applied and lifted manually by using the F11 failures window to apply isolations to individual track sections.
Twitter
Log in to reply
Engineering possession/Sea Wall closures finished notifications 02/01/2019 at 15:50 #114537
DriverCurran
Avatar
682 posts
Online
Steamer in post 114507 said:
There are only a handful of simulations that have possessions which are lifted during the day- I think it's just Edge Hill and Oxted, both of which are intended for use with the 15/10/2009 timetable. All other possessions are in force for the entire day.
I also put the groundhog day possessions in East Coastway and indeed they will appear in anything new of mine that gets released. You can use the possession scenario with any timetable, however that does come with the warning that you as the user may need to be amending trains which would otherwise run through the block, so just be wary if you do this.

Paul

You have to get a red before you can get any other colour