Included Scenarios

Included Scenarios

The following scenarios have been created for the 'enjoyment' of the virtual Oxted signaller.

Scenario name Description of scenario
Developer No Simulation problems or delays, this should be selected along with the Beginner option.
Standard Normal running, no lines or platforms closed. Limited temporary speed restrictions, trackside failures, delays and disturbances. This is designed for use with the Beginner or Standard simulation option.
East Grinstead Possession Routine maintainence is taking place between Lingfield and East Grinstead Up Siding. Lingfield Ground Frame is manned for the days service. The will work best with a purpose built timetable, although it could be possible to amend the supplied timetable to allow trains to terminate at Lingfield.
Uckfield Blockade The lines between Crowborough Tunnel and Uckfield have been taken possession of by the structure engineer for repairs to Greenhurst Viaduct. Trains will use the terminating facilities at Crowborough. The will work best with a purpose built timetable, although it could be possible to amend the supplied timetable to allow trains to terminate at Crowborough.
Random shift One of the above activities will be chosen by the sim at random.
15th October 2009 This scenario is designed for use with the 15th October series of timetables. Any possessions in force on this day will take place in the session. This scenario is designed to run in 2008 era.

Users of SimSig have enjoyed the 2009 set of timetables, and fixed all day possessions. Now for the first time there is a dedicated scenario created with 15/09/2009 in mind. A big new feature of this scenario is that any possessions that were in force on the day will feature in the session and will be taken and given up at the appropriate times. It is down to the user to ensure that the requested lines are clear of trains and controlled signals are at danger before granting the Person In Charge Of Possession his signal protection. Possession overruns are possible, and if they occur you will need to deal with the train service as you see fit. The simulation will apply the reminders at the start of the possession however you will have to remove them when the possession ends. See this page for details of how to do this.