NLL SCROLLY 2009TT 4L60

You are here: Home > Forum > Simulations > Timetables > North London Line > NLL SCROLLY 2009TT 4L60

Page 1 of 1

NLL SCROLLY 2009TT 4L60 05/05/2012 at 07:51 #32123
mickev
Avatar
37 posts
Just a query about 4L60,i see it shows 2 xcl66,should it be a cl66 leading and a cl90/86 D.I.T(dead in traffic)pan down.The class 66 detaches,then cl90/86 raises pan and continues on with 4L60.Maybe this is not possible to create.
Regards
Mick

Log in to reply
Re: NLL SCROLLY 2009TT 4L60 06/05/2012 at 14:36 #32144
Guts
Avatar
584 posts
Best way to do it is have the inward train arrive at the destination, where it is to divide, as 4L60-1 with a Detach Rear of 4L60.

4L60-1 - DR:4L60 N:0L60

Have the 4L60-1 as diesel hauled and 4L60 as Electric hauled in the timetable.

On a NLL timetable, where it detaches on a different Sim, it doesn't really matter

Log in to reply
Re: NLL SCROLLY 2009TT 4L60 06/05/2012 at 15:06 #32145
Peter Bennet
Avatar
5354 posts
If this was built on latest core-code then it should be possible.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply